Source(s) of the information:

Lawyers, other representatives, expert(s), tribunal’s secretary

Award

TABLE OF SELECTED ABBREVIATIONS AND DEFINED TERMS

BIT, the UK-Hungary BIT or the Treaty The Agreement between the Government of the United Kingdom of Great Britain and Northern Ireland and the Government of the Hungarian People's Republic for the Promotion and Reciprocal Protection of Investments, dated 9 March 1987 and entered into force on 28 August 1987 (CL-1)
C- Claimants' Exhibit
CJEU The Court of Justice of the European Union
CL- Claimants' Legal Authority
CM Claimants' Memorial of 27 April 2018
Commission The European Commission
CPP The Code of Civil Procedure of Hungary
C-Rejoinder Claimants' Rejoinder on Jurisdiction of 29 April 2019
C-Reply Claimants' Reply on Jurisdiction, the Merits and Quantum of 20 December 2018
CWS Claimants' Witness Statement
DCF Discounted cash flows
ECT The Energy Charter Treaty
ER Expert Report
EURIBOR Euro Interbank Offered Rate
Fidesz The Hungarian Civic Alliance, a political party that is and has been in power in Hungary during the adoption of the disputed measures
GBP British Pound
Hearing The Hearing on Jurisdiction, Liability and Quantum held on 27 to 30 May 2019
HUF Hungarian Forint
ER Expert Report
EU The European Union
EUR Euro
ICSID Convention or the Convention The Convention on the Settlement of Investment Disputes Between States and Nationals of Other States dated 18 March 1965
ICSID or the Centre The International Centre for Settlement of Investment Disputes
ICSID Rules The ICSID Rules of Procedure for Arbitration Proceedings 2006
ILC International Law Commission
Kft Korlátolt felelősségű társaság, Hungarian equivalent of a limited liability company
LIBOR London Interbank Offered Rate
LLP Limited liability partnership
LTD Limited company
LLC Limited liability company
MNV Hungarian National Asset Management Agency
NLA or NLF The National Land Agency also referred to as the National Land Fund, a State-owned agricultural land management agency created under Act CXVI of 1 January 2002 (R-8)
No./Nos. Number/Numbers
PO Procedural Order
PWC PricewaterhouseCoopers
R- Respondent's Exhibit
RL- Respondent's Legal Authority
RCM Respondent's Counter-Memorial on the Merits, Quantum and Objections to Jurisdiction of 7 September 2018
R-Rejoinder Respondent's Rejoinder on the Merits and Quantum and Reply on Jurisdiction of 26 March 2019
TEU The Treaty on the European Union
TFEU The Treaty on the Functioning of the European Union
USD United States Dollar
UNCITRAL The United Nations Commission on International Trade Law
VCLT The Vienna Convention on the Law of Treaties
WS Witness Statement
Zrt Zártkörüen működő részvénytársaság, Hungarian equivalent of a company limited by shares

I. PRELIMINARY MATTERS

1.
This case concerns a dispute submitted to the International Centre for Settlement of Investment Disputes ("ICSID" or the "Centre") on the basis of the Agreement between the United Kingdom of Great Britain and Northern Ireland and the Hungarian People's Republic for the Promotion and Reciprocal Protection of Investments, dated 9 March 1987 (the "UK-Hungary BIT" or the "BIT" or the "Treaty")1 and the Convention on the Settlement of Investment Disputes between States and Nationals of Other States, which entered into force on 14 October 1966 and became binding on Hungary on 6 March 1987 and on the United Kingdom on 18 January 1967 (the "ICSID Convention").

A. THE PARTIES

2.

The Claimants (together referred to as the "Claimants") are:

(i) Magyar Farming Company Ltd ("Magyar"), a company incorporated and existing under the laws of the United Kingdom (the "UK");2

(ii) Kintyre Kft ("Kintyre"), a company incorporated and existing under the laws of Hungary;3 and

(iii) Inícia Zrt. ("Inícia"), a company incorporated and existing under the laws of Hungary.4

3.
The Respondent is Hungary ("Hungary" or the "Respondent"), a sovereign State and a member of the European Union as well as a contracting State to the ICSID Convention and the BIT.
4.
The Claimants and the Respondent are collectively referred to as the "Parties". The Parties' representatives and their addresses are listed above on page (i).

B. THE DISPUTE

5.
The dispute arises out of Hungary's measures regulating possession and disposal of State- owned agricultural land, which, according to the Claimants, resulted in the expropriation of their leasehold rights to 760 hectares of State-owned land located in Hungary's NorthWestern region of Ikrény (the "Land") and in a diminution of the value of their farming business in Hungary (the "Farm").
6.
The Claimants contend that, pursuant to the lease agreement between Inícia and Hungary's State-owned asset management agency, concluded on 25 July 19945 and amended and extended in 19996 and 20067 (the "Lease Agreement" or the "Lease"), Inícia had a contractual and a statutory pre-lease right to the Land. For the Claimants, this entailed that, if Hungary intended to lease the Land to a third party upon the expiration of the Lease Agreement (in July 2014), it should inform Inícia of any offer from a third party that it intended to accept. The pre-lease right, so say the Claimants, then entitled Inícia to "step in and assume the offer from the third party" and thereby enter into a renewed lease agreement upon the terms of that offer.8
7.
The Claimants contend that, in 2011, the Parliament passed an amendment to the land law,9 which precluded lessees of State-owned agricultural land plots from exercising their statutory pre-lease rights in cases where the National Land Agency (the "NLA") leased the land out by way of a tender. According to the Claimants, the Respondent then "orchestrated a rigged tender process whereby, despite the Respondent's prior assurances and despite the Claimants' superior bids, the leases were ‘won' by third parties in January 2014."10 As a result, according to the Claimants, security guards acting under the direction of the Respondent, evicted them from the Land in blatant disregard of their pre-lease rights and the interim possessory protection that Inícia had obtained from the local authorities.
8.
The Claimants contend that the Respondent's measures constitute an unlawful expropriation of the Claimants' leasehold rights to the Land contrary to Article 6 of the BIT and request the Tribunal to award full compensation of damages resulting from the Respondent's wrongful conduct.
9.
The Respondent fully rejects these claims. As a preliminary matter, it submits that the Tribunal lacks jurisdiction to resolve the dispute, since the dispute resolution provision of the BIT is inapplicable due to Hungary's accession to the European Union in 2004, and in any event, because the Claimants' alleged rights in relation to which the dispute arises either expired on their own terms or do not constitute an investment for the purposes of the BIT and the ICSID Convention.
10.
On the merits, the Respondent submits that the Claimants held no rights capable of being expropriated at the time of the disputed measures, and in any event, the measures did not constitute a sovereign interference or a taking of the purported pre-lease rights. The Respondent also rejects having expropriated the Claimants' investment as a whole, as the Claimants still continue their farming activity in Hungary at profit.
11.
The Respondent further opposes the Claimants' quantification of the alleged loss as grossly overstated. It submits that any award for damages should be limited to the fair market value of the allegedly expropriated asset and not extend to remote consequential losses as the Claimants claim. In addition, according to the Respondent, the Claimants failed to mitigate their loss, which should result in a further reduction of the claimed compensation. Considering these factors, the Respondent offers an alternative valuation of the Claimants' alleged loss.

C. REQUESTS FOR RELIEF

12.

The Claimants formulated their request for relief in the Reply11 as follows:

[T]he Claimants respectfully invite the Tribunal to render a Final Award:

a. Declaring that the Respondent has breached the BIT by expropriating the Claimants' investment without complying with the requirements of Article 6 of the BIT, including payment of prompt, adequate and effective compensation;

b. Ordering the Respondent to pay to the Claimants damages representing full reparation for losses sustained as a result of the expropriation in the sum of €17.9m, plus the costs and expenses of these arbitration proceedings (including lawyers' and experts' fees and expenses, and the fees and expenses of ICSID and the Tribunal), and the costs and expenses of the local court proceedings in Hungary (in the sum of HUF 57,222,236), together with interest compounded semi-annually at the rate of 7.87% until the date of payment;

c. Alternatively, as regards costs and expenses, ordering the Respondent to pay to the Claimants, as costs, all the costs and expenses of these arbitration proceedings (including lawyers' and experts' fees and expenses, and the fees and expenses of ICSID and the Tribunal), as well as the costs and expenses of the local court proceedings in Hungary (HUF 57,222,236), together with interest compounded semi-annually at the rate of 7.87% until the date of payment.

13.

The Respondent formulated its request for relief in the Rejoinder12 as follows:

Respondent respectfully requests the Tribunal to:

- Declare that it does not have jurisdiction over Claimants' claims;

- To the extent it decides it has jurisdiction over Claimants' claims, dismiss all of Claimants' claims under Article 6(1) of the BIT;

- To the extent it declares Respondent to be responsible for a violation of Article 6(1) of the BIT,

o declare that Claimants failed to mitigate their losses and therefore determine that the amount payable by Respondent as compensation cannot exceed EUR 930,000; or

o if it determines that Claimants did not fail to mitigate their losses, determine the compensation payable by Respondent in an amount not exceeding the fair market value of Claimants' alleged pre-lease right.

- Order Claimants to pay Respondent's expenses (including legal and expert fees and disbursements) and all other costs of the arbitration.

14.

Following the Hearing, in its letter of 21 June 2019, the Respondent presented an amended request for relief, which reads as follows:

Respondent respectfully requests the Tribunal to:

- Declare that it does not have jurisdiction over Claimants' claims;

- To the extent it decides it has jurisdiction over Claimants' claims, dismiss all of Claimants' claims under Article 6(1) of the BIT;

- To the extent it declares Respondent to be responsible for a violation of Article 6(1) of the BIT,

o declare that Claimants failed to mitigate their losses and therefore determine that the amount payable by Respondent as compensation cannot exceed EUR 930,000; or

o if it determines that Claimants did not fail to mitigate their losses, determine the compensation payable by Respondent in an amount not exceeding the fair market value of Claimants' alleged pre-lease right; or

o if it determines that the compensation payable by Respondent should be determined by subtracting the Actual Value of the Farm from the But For Value of the Farm:

• direct Claimants to keep Respondent informed of any sale of the Farm; and

• subtract from the compensation payable by Respondent all sums Claimants may receive above the Farm's Actual Value (as determined by the Tribunal) in case they sell the Farm before the Award is paid, or

• order that Claimants shall pay to Respondent all sums Claimants may receive above the Farm's Actual Value (as determined by the Tribunal) in case they sell the Farm after the Award is paid.

- Order Claimants to pay Respondent's expenses (including legal and expert fees and disbursements) and all other costs of the arbitration.

15.
The Claimants object to the admissibility of the amendment of the Respondent's request for relief.13

D. THE TRIBUNAL

16.
The Tribunal was constituted on 4 January 2018 in accordance with the ICSID Convention and the ICSID Arbitration Rules. The Parties confirmed that the Tribunal was properly constituted and that they have no objection as to the appointment of any member of the Tribunal.14 The following persons comprise the Tribunal:

(1) Arbitrator appointed by the Claimants

Dr. Stanimir A. Alexandrov
Stanimir A. Alexandrov PLLC
1501 K Street, N.W.
Suite C-072
Washington D.C. 20005
USA
Tel.: +1 (202) 736 8186

(2) Arbitrator appointed by the Respondent

Dr. Inka Hanefeld
Hanefeld Rechtsanwälte
Brooktorkai 20
Hamburg, 20457
Germany
Tel.: +49 40 180482930

(3) Presiding Arbitrator

Professor Gabrielle Kaufmann-Kohler
Lévy Kaufmann-Kohler
3-5 rue du Conseil-Général
P.O. Box 552
CH-1211 Geneva 4 Switzerland
Tel.: +41 22 809 62 00

(4) Secretary of the Tribunal

17.
The Secretary-General of ICSID has appointed as the Secretary of the Tribunal:

Ms. Laura Bergamini
ICSID
MSN J2-200
1818 H Street, N.W.
Washington, D.C. 20433
USA
Tel.: + 1 (202) 473-6183
Fax: + 1 (202) 522-2615
Email: lbergamini@worldbank.org

(5) Assistant to the Tribunal

18.
With the consent of the Parties, the Tribunal appointed as the Assistant to the Tribunal:

Mr. David Khachvani
3-5 Rue du Conseil-General
P.O. Box 552
CH-1211 Geneva 4 Switzerland
Tel: +41 22 809 6193

19.
The functions of the Assistant are set out in the Tribunal's letter of 15 January 2018, which the Parties accepted as recorded at paragraph 8.3 of Procedural Order No. 1.

E. PLACE OF PROCEEDINGS

20.
Pursuant to Article 62 of the ICSID Convention, the place of the proceedings is Washington, D.C. However, as confirmed in ICSID's email of 8 May 2019, the Parties agreed to conduct the Hearing at the World Bank offices in Paris, France.

F. APPLICABLE LAWS

(1) Procedure

21.

Pursuant to Article 44 of the ICSID Convention, the procedure of this arbitration is governed by the following instruments and rules in the following order of precedence:

• Section I of Chapter IV of the ICSID Convention;

• Any rules of procedure agreed upon by the Parties; and

• The ICSID Rules of Procedure for Arbitration Proceedings (the "ICSID Rules").

22.
If a question of procedure arises which is not covered by the instruments listed in the preceding paragraph, the Tribunal shall decide the question. Accordingly, the Tribunal has issued multiple procedural directions throughout this arbitration, including, but not limited to, Procedural Orders Nos. 1, 2 and 3.

(2) Merits

23.

Pursuant to Article 42(1) of the ICSID Convention, when resolving the dispute, the Tribunal must primarily apply the law agreed upon by the Parties; in the absence of which, it shall apply the laws of the respondent State and international law as may be applicable:

The Tribunal shall decide a dispute in accordance with such rules of law as may be agreed by the parties. In the absence of such agreement, the Tribunal shall apply the law of the Contracting State party to the dispute (including its rules on the conflict of laws) and such rules of international law as may be applicable.

24.
It is common ground that the Parties have made no explicit choice of law. For the Claimants, however, the merits of the dispute is subject to international law, since the claims are based on the BIT, i.e. an international treaty.15 The Respondent in turn points to the fact that the BIT contains no choice-of-law clause and argues that the choice of international law cannot be implied from the sole fact that the claims may arise out of the BIT.16
25.
ICSID jurisprudence supports the approach that, when the disputing parties have made no express choice-of-law, such choice cannot be implied from the mere fact that the claims arise under an international treaty.17 For instance, according to the tribunal in Perenco v. Ecuador, where "the Treaty does not contain an express applicable law clause […] the Tribunal must apply Article 42(1), second sentence, of the ICSID Convention".18 Prominent commentators of the ICSID Convention also affirm that "an agreement under Art. 42(1) requires an affirmative choice and should be express."19 In this respect, it is telling that the Claimants themselves rely on Hungarian law when addressing the issues such as the nature and the scope of their alleged leasehold rights.
26.
Therefore, in the absence of a choice-of-law provision in the BIT, or elsewhere for that matter, the default rule of the second sentence of Article 42(1) of the ICSID Convention applies. This provision does not allocate specific matters to either international or domestic law. Instead, it calls for the application of either of these laws "as may be applicable" to a particular issue in dispute. It is thus for the Tribunal to determine whether a particular issue is subject to national or international law.20 In doing so, the Tribunal will be guided primarily by the BIT.
27.

When applying the law, whether municipal or international, the Tribunal is not bound by the arguments and sources invoked by the Parties. The principle of iura novit arbiter allows the Tribunal to form its own opinion of the meaning of the law, provided that it does not surprise the Parties with a legal theory that was not subject to debate and that the Parties could not anticipate.21

G. SCOPE OF THIS AWARD

28.
Pursuant to the Procedural Calendar established with the agreement of the Parties at the outset of the proceedings,22 the present award finally resolves the Respondent's preliminary objections as well as the issues of liability and quantum.

II. PROCEDURAL HISTORY

29.
On 14 July 2017, ICSID received a request for arbitration dated 4 July 2017 from the Claimants against Hungary, together with exhibits C-1 through C-25 and legal authorities CL-1 and CL-2 (the "Request").
30.
On 1 August 2017, the Secretary-General of ICSID registered the Request in accordance with Article 36(3) of the ICSID Convention and notified the Parties of the registration. In the Notice of Registration, the Secretary-General invited the Parties to proceed to constitute an arbitral tribunal as soon as possible in accordance with Rule 7(d) of ICSID's Rules of Procedure for the Institution of Conciliation and Arbitration Proceedings.
31.
By emails of 5 September 2017, the Parties agreed to constitute the Tribunal in accordance with Article 37(2)(a) of the ICSID Convention as follows: the Tribunal would consist of three arbitrators, one to be appointed by each Party and the third, the presiding arbitrator, to be appointed by agreement of the Parties.
32.
By letter of 12 September 2017, the Claimants appointed Dr. Stanimir A. Alexandrov, a national of Bulgaria, as arbitrator in this case, who accepted his appointment on 13 September 2017.
33.
By letter of 9 October 2017, the Respondent appointed Dr. Inka Hanefeld, a national of Germany, as arbitrator in this case, who accepted her appointment on 10 October 2019.
34.
By emails of 10 November 2017, the Parties informed the Centre that they had agreed to appoint Professor Dr. Klaus Sachs, a national of Germany, as President of the Tribunal.
35.
By letter of 14 November 2017, the Centre informed the Parties that Professor Dr. Sachs had declined his appointment.
36.
By emails of 17 November 2017, the Parties informed the Centre that they had agreed to request the Chairman of the ICSID Administrative Council to appoint the presiding arbitrator. Accordingly, on 12 December 2017, ICSID sent the Parties a ballot inviting them to consider a list of candidates to act as the presiding arbitrator.
37.
By emails of 21 December 2017, the Parties informed the Centre that they had conferred over the names proposed in the ballot and that they had agreed to appoint Professor Gabrielle Kaufmann-Kohler, a national of Switzerland, as presiding arbitrator.
38.
On 4 January 2018, the Secretary-General, in accordance with Rule 6(1) of the ICSID Rules, notified the Parties that Professor Kaufmann-Kohler, Dr. Alexandrov, and Dr. Hanefeld had accepted their appointments and that the Tribunal was therefore deemed to have been constituted on that date. Ms. Laura Bergamini, ICSID Legal Counsel, was designated to serve as Secretary of the Tribunal.
39.
By emails of 8 January 2018, the Parties indicated that, unless the Tribunal had a preference for an in-person hearing, they agreed to hold the first session by telephone.
40.
By letter of 15 January 2018, the Tribunal (i) proposed to hold the first session by telephone conference on 26 January 2018 and invited the Parties to confirm their availability; (ii) circulated a draft Procedural Order No. 1 and a draft agenda for the Parties to comment in preparation of the first session; and (iii) proposed the Parties to appoint Mr. David Khachvani, a lawyer from the President's firm, as Assistant to the Tribunal in this case.
41.

By email of 17 January 2018, the Claimants confirmed the Parties' availability for a first session on the proposed date. The Claimants also indicated that:

[T]he Claimants (who are first, and hopefully last, time users of the ICSID process) are initially uncomfortable with the Tribunal's proposal to delegate many important tasks to an assistant and to add a not inconsiderable costs line for this assistant in the draft procedural order. The Claimants reserve their position on this issue.

In the event that the parties agree to the appointment of an assistant, the parties respectfully propose that the assistant's role in "preparing initial drafts of…awards" should be amended to read "preparing initial drafts of the Procedural Background, Factual Background and Parties' Positions sections of any award".

42.
By email of the same date, the Respondent confirmed its availability on the proposed date for the first session. The Respondent further informed the Tribunal that it had no issue with the proposed appointment of Mr. Khachvani as Assistant to the Tribunal, but indicated that it "would appreciate if the description of the role of the assistant in drafting procedural orders and awards was refined in a way to involve drafting ‘appropriate parts' of such documents only."
43.
By letter of 17 January 2018, the Tribunal confirmed that the first session would be held on 26 January 2018 by telephone conference.
44.
On 24 January 2018, the Parties submitted a draft Procedural Order No. 1 containing their consolidated comments, along with their respective proposals for the procedural calendar.
45.
In accordance with ICSID Arbitration Rule 13(1), the Tribunal held a first session with the Parties on 26 January 2018 by telephone conference.
46.
On 2 February 2018, the Tribunal circulated a revised draft Procedural Order No. 1 and informed the Parties that such Procedural Order would become effective on 9 February 2018 unless a party requested the correction of a clerical mistake or raised a substantiated objection to a matter that had not already been the subject of discussion during the first session. The Tribunal also circulated the declaration signed by Mr. Khachvani.
47.
On 9 February 2018, the Parties submitted their joint proposal for a revised draft Procedural Order No. 1.
48.
By letter of 13 February 2018, the Tribunal informed the Parties that it was minded to accept the Parties' revised draft Procedural Order No. 1 subject to certain modifications, to which the Parties agreed by emails of the same date.
49.
On 14 February 2018, the Tribunal issued Procedural Order No. 1 recording the agreement of the Parties on procedural matters. Procedural Order No. 1 provides, inter alia, that the applicable Arbitration Rules would be those in effect from 10 April 2006, that the procedural language would be English, and that the place of the proceedings would be Washington, D.C., USA. It also establishes the procedural calendar for the proceedings.
50.
By letter of 30 March 2018, the Respondent raised a jurisdictional objection due to the outcome of the case Slovak Republic v. Achmea before the Court of Justice of the European Union, and requested that the Tribunal issue a decision to bifurcate the proceedings and hear this jurisdictional objection in a preliminary phase.
51.
By letter of 4 April 2018, the Claimants presented their observations on the Respondent's request of 30 March 2018, as per the Tribunal's instructions.
52.
By email of 5 April 2018, the Tribunal indicated that it understood that the Parties had presented their positions on the Respondent's request of 30 March 2018 and that, consequently, it would proceed with rendering the decision on bifurcation. The Tribunal also indicated that the procedural calendar set out in Annex A to Procedural Order No. 1 remained in force.
53.

On 10 April 2018, the Tribunal decided on the Respondent's request of 30 March 2018 as follows:

For reasons of efficiency, especially because the agreed calendar which did not provide for bifurcation is already well under way, the Tribunal is of the view that the proceedings should now continue as scheduled. The Achmea defense (and any others) can be addressed in the context of the Counter-Memorial and of the further submissions.

54.
On 27 April 2018, the Claimants filed their Memorial on the Merits, together with the witness statement of Mr. Andrew Alexander Hunter, the expert report of Mr. James Gilbey FCA, the expert opinion of Professor Gábor Halmai, exhibits C-26 through C-131, and legal authorities CL-3 through CL-29.
55.
By email of 4 May 2018, the Tribunal invited the Parties to indicate their preference in respect of the place of the hearing.
56.
By email of the same date, the Claimants indicated their preference for a hearing in Paris, France.
57.
By email of 8 May 2018, the Respondent indicated that, despite its preference to hold the hearing in Washington, D.C., it remained amenable to compromise on the hearing to take place in Paris, France.
58.
On 8 May 2018, the Tribunal confirmed that the hearing would be held at the World Bank offices in Paris, France.
59.
On 22 August 2018, the European Commission filed an application to intervene as a non-disputing party pursuant to ICSID Arbitration Rule 37(2) (the "Commission's Application").
60.
On 30 August 2018, the Parties filed their observations on the Commission's Application.
61.

On 5 September 2018, the Tribunal decided that it:

(i) grants the Commission leave to file a written amicus curiae submission by 20 January 2019, limited to the legal consequences of the Achmea Judgment for the present case;

(ii) allows the Commission to access the relevant parts of the Parties' written submissions (excluding evidence) as set out above;

(iii) denies the Commission's request to attend hearings and to present oral arguments.

62.
On 7 September 2018, the Respondent filed its Counter-Memorial on the Merits and Memorial on Jurisdiction, together with the witness statement of Dr. Márton Örs Bitay, the expert opinion of Professor Attila Menyhárd, the expert report of Messrs. Kiran Sequeira and Stuart Dekker of Versant Partners, LLC, exhibits R-1 through R-28, and legal authorities RL-1 through RL-74.
63.
On 21 September 2018, in accordance with the calendar set out in Annex A to Procedural Order No. 1, the Parties exchanged their requests for production of documents.
64.
On 8 October 2018, the Parties voluntarily produced certain documents requested by the other Party and/or submitted their objections to such document production requests.
65.
On 18 October 2018, the Parties submitted their replies to the opposing Party's objections.
66.
On 29 October 2018, the Tribunal issued Procedural Order No. 2 concerning production of documents.
67.
By email of 23 November 2018, the Claimants informed the Tribunal that the Respondent had failed to comply with the Tribunal's Order regarding Request No. 3 of Annex A to Procedural Order No. 2; and requested, inter alia, that "the Tribunal order Respondent to produce, within a very short deadline, the documents ordered in Request No. 3 of Annex A to Procedural Order No. 2 or a written explanation of the alleged legal constraints preventing disclosure." The Respondent provided its comments on the Claimants' email on the same date.
68.
By email of 24 November 2018, the Tribunal granted the Respondent until 30 November 2019 noon (CET) to make its best efforts to come forward with a solution or otherwise provide any relevant explanations with respect to its inability to comply with Request No. 3 of Annex A of Procedural Order No. 2.
69.
By email of 30 November 2019, the Claimants requested that the Tribunal take formal note of the Respondent's failure "(i) to comply with the Tribunal's Order regarding Request No. 3 of Annex A to Procedural Order No. 2; (ii) to reveal or explain its non-compliance on 19 November; and (iii) to provide the promised detailed explanation for such non-compliance by noon CET today." The Respondent presented its observations on the Claimants' email on the same date.
70.
By email of 4 December 2018, the Claimants provided further comments concerning the Respondent's obligation to produce certain documents pursuant to Procedural Order No. 2.
71.
On 11 December 2018, the Tribunal informed the Parties that "if necessary in light of all the circumstances, the Tribunal [would] address the issue of the Respondent's failure to comply with Procedural Order No. 2 and the possible legal consequences at a later stage, most likely in the Award."
72.
On 20 December 2018, the Claimants filed their Reply on the Merits and CounterMemorial on Jurisdiction, along with the second expert opinion of Professor Attila Menyhárd, the second expert opinion of Professor Gábor Halmai, the expert opinion of Professor Dr. Miklós Király, the supplemental independent expert report of Mr. James Gilbey, the second witness statement of Mr. Andrew Alexander Hunter, exhibits C-132 through C-236, and legal authorities CL-30 through CL-68. The Claimants also submitted a redacted version of their Reply on the Merits and Counter-Memorial on Jurisdiction.
73.
On 9 January 2019, the Respondent submitted a redacted version of its Counter-Memorial on the Merits and Memorial on Jurisdiction.
74.
By letter of 11 January 2019, the Tribunal informed the Commission that the redacted versions of the Parties' first exchange of briefs on jurisdiction were available, and invited the Commission to provide a confidentiality declaration, should it wish to consult them.
75.

By email of 14 January 2019, the Commission indicated that:

As set out in the application for leave to intervene, the Commission agents are bound to strict confidentiality on the basis of Article 339 Treaty on Functioning of European Union, […]

The Commission understands that the Arbitral Tribunal considers additional guarantees necessary, but would be thankful for a confirmation that that is indeed the case.

Furthermore, if that is the case, in order to assess whether the Commission can give such an agreement, it would be necessary that the Arbitral Tribunal provides the Commission with "the confidentiality obligations applicable to the participants of these proceedings, including Section 27 of Procedural Order No. 1".

76.
By email of 14 January 2019, the Tribunal informed the Parties that it was "inclined to consider that the explanations given in [the Commission's] email provide sufficient protection of confidentiality for ICSID to give the EU Commission access to the redacted versions of the Counter-Memorial and Reply"; and that if the Parties did not share this view, it would then "seek a formal undertaking and share the content of Section 27.1 of Procedural Order No. 1 with the EU Commission."
77.
By emails of 14 and 16 January 2019, the Respondent and the Claimants, respectively, confirmed that they had no objection to the Tribunal's approach. Accordingly, the Centre transmitted redacted briefs to the Commission, on that same day.
78.
On 20 January 2019, the Commission filed its Amicus Curiae Brief, together with Annexes EC01 through EC32.
79.
On 29 January 2019, the Tribunal invited the Parties to comment in their second exchange of written submissions on jurisdiction and, if required, at the oral hearing, on the Declaration of the Representatives of the Governments of the Member States of the European Union of 16 January 2019 on the Enforcement of the Judgment of the Court of Justice in Achmea and Hungary's separate declaration of the same date (the "2019 Declarations"), which were submitted as annexes EC31 and EC32 by the Commission. The Tribunal also invited the Parties to address the possible effects of the United Kingdom's pending withdrawal from the European Union on this Tribunal's jurisdiction.
80.
By letter of 25 February 2019, the Tribunal proposed that the Parties identify the witnesses and experts to be cross-examined at the hearing on 19 April 2019. The Tribunal also asked the Parties if they could agree to postpone the pre-hearing telephone conference scheduled at 16:00 to 18:30 (CET).
81.
By emails of 28 February 2019, the Parties confirmed that they had no objections to the timing proposed by the Tribunal on 25 February 2019.
82.
By email of the same date, the Tribunal confirmed that the Parties should identify the witnesses and experts to be cross-examined at the hearing by 19 April 2019; and that the pre-hearing telephone conference would be held on 29 April 2019 at 18:30 (CET).
83.
By email of 1 March 2019, the Respondent informed the Tribunal that the Parties conferred and agreed to extend the submission deadline of the Respondent's Rejoinder on the Merits and Quantum (and Reply on Jurisdiction) until 25 March 2019, and the submission deadline of the Claimants' Rejoinder on Jurisdiction until 26 April 2019. The Tribunal approved the extensions on 4 March 2019.
84.
By emails of 24 March 2019, the Parties informed the Tribunal that they conferred and agreed to extend the deadline for the submission of the Respondent's Rejoinder on the Merits and Quantum and Reply on Jurisdiction until 26 March 2019. The Claimants further noted that they did not seek an extension for the filing of their Rejoinder on Jurisdiction at this stage, but reserved their right to do so, if required, upon review of Respondent's Rejoinder.
85.
By email of 25 March 2019, the Tribunal confirmed its agreement with the requested extension of the time limit for filing the Respondent's Rejoinder and took note of the content of the Claimants' email regarding the time limit for filing the Claimants' Rejoinder on Jurisdiction.
86.
On 26 March 2019, the Respondent filed its Rejoinder on the Merits and Quantum and Reply on Jurisdiction, along with the second expert opinion of Professor Attila Menyhárd, the second expert report of Messrs. Kiran Sequeira and Stuart Dekker of Versant Partners, LLC, exhibits R-29 through R-39, and legal authorities RL-75 through RL-111.
87.
On 19 April 2019, each party provided the list of witnesses and experts that it intended to cross-examine at the hearing.
88.
On 24 April 2019, the Tribunal circulated a draft Procedural Order No. 3 in preparation of the pre-hearing organizational meeting scheduled to be held on 29 April 2019.
89.
On 26 April 2019, the Claimants filed their Rejoinder on Jurisdiction, together with exhibits C-237 through C-255, and legal authorities CL-69 through CL-75.
90.
On 29 April 2019, the President of the Tribunal held a pre-hearing organizational meeting with the Parties by telephone conference.
91.
On 2 May 2019, the Tribunal circulated a revised Procedural Order No. 3 and informed the Parties that the draft Procedural Order No. 3 would become effective on 4 May 2019 unless either party raised a serious concern regarding a matter that had not been discussed during the pre-hearing organizational meeting.
92.
By email of the same date, the Claimants requested that a clarification be included to the draft Procedural Order No. 3 circulated that day. The Respondent presented its observations on the Claimants' request on 3 May 2019, as per the Tribunal's instructions. The Claimants provided further comments on 4 May 2019, to which the Respondent responded on 6 May 2019, as per the Tribunal's instructions.
93.
On 10 May 2019, the Tribunal issued Procedural Order No. 3 concerning the organization of the hearing.
94.
By email of 24 May 2019, the Centre informed the Parties that Mr. Francisco Abriani, ICSID Legal Counsel, would attend the hearing on behalf of Ms. Bergamini.
95.
On 26 May 2019, the Respondent provided Professor Menyhárd's CV, as well as complete or supplemented translations of the following exhibits: C-126, C-143 and C-237, C-192, C-246, and C-255, which are respectively named: R-40, R-41, R-42 and R-43. The Respondent submitted new exhibits R-44 and R-45. In agreement with the Claimants, the Respondent further submitted the supplemented translations of exhibits R-34, C-44 and C-114. Both Parties reserved their rights to challenge the correctness of the translations.
96.
A hearing on the merits and jurisdiction was held in Paris, France, from 27 to 30 May 2019 (the "Hearing"). The following persons were present at the Hearing:

Tribunal :
Professor Gabrielle Kaufmann-Kohler President
Dr. Stanimir A. Alexandrov Arbitrator
Dr. Inka Hanefeld Arbitrator
Mr. David Khachvani Assistant to the Tribunal

ICSID Secretariat :
Mr. Francisco Abriani Secretary of the Tribunal

For the Claimants :
Counsel:
Mr. Zannis Mavrogordato 20 Essex Street Chambers
Dr. András Dániel Lászlo LFB

Parties:
Mr. Andrew Alexander Hunter Managing Director and Shareholder of the Claimants
Mr. David Gunner Chairman and Shareholder of Magyar Farming Company
Mr. Nicholas Tapp Director and Shareholder of Magyar Farming Company
Mr. Christopher Combe Director and Shareholder of Magyar Farming Company
Mr. Simon Weaver Director and Shareholder of Magyar Farming Company
Mr. Michael Papworth Shareholder of Magyar Farming Company
Mr. Michael Arlington Shareholder of Magyar Farming Company
Mr. Paul Findley Shareholder of Magyar Farming Company

Witness:
Mr. Andrew Alexander Hunter

Experts:
Mr. James Gilbey Mazars
Mr. Alex Houston Mazars
Professor Dr. Miklós Király
Professor Gábor Halmai

For the Respondent :
Counsel:
Mr. András Nemescsói DLA Budapest
Mr. Michael Ostrove DLA France
Mr. Théobald Naud DLA France
Ms. Clémentine Emery DLA France
Ms. Zsófia Deli DLA Budapest
Ms. Kate Mala DLA Budapest
Mr. Zoltán P. Kovács KPZ and Partners
Mr. András Lovas Sárhegyi and Partners
Ms. Viktória Perényi Sárhegyi and Partners
Mr. Dávid Kőhegyi DLA Budapest

Parties:
Mr. Tamás Andréka Ministry of Agriculture

Witnesses:
Dr. Márton Örs Bitay (by video conference)

Experts:
Professor Attila Menyhárd Eötvös Loránd University (ELTE)
Mr. Kiran Sequeira Versant Partners
Mr. Stuart Dekker Versant Partners

Court Reporter :
Ms. Dawn K. Larson B&B Reporters

Interpreters :
Mr. Sándor Mesterházy English/Hungarian
Mr. Tamás Schild English/Hungarian
Mr. Peter Koczoh English/Hungarian

97.
During the Hearing, the following persons were examined:

On behalf of the Claimants :
Mr. Andrew Alexander Hunter
Professor Gábor Halmai
Mr. James Gilbey Mazars

On behalf of the Respondent :
Dr. Márton Örs Bitay (by video conference)
Professor Attila Menyhárd Eötvös Loránd University (ELTE)
Mr. Kiran Sequeira Versant Partners
Mr. Stuart Dekker Versant Partners

98.
During the Hearing, the Respondent submitted the demonstrative exhibit of Versant Partners (VP-DE-1) as well as an electronic copy of the Respondent's Opening Presentation, while the Claimants submitted the demonstratives used in Mr. Gilbey's presentation.
99.
On 3 June 2019, the Tribunal issued Procedural Order No. 4 concerning post-hearing matters.
100.
By letter of 21 June 2019, further to the Tribunal's instruction during the Hearing, the Respondent submitted a request to amend the request for relief set out in its Rejoinder on the Merits and Quantum and Reply on Jurisdiction at paragraph 581. By email of 24 June 2019, the Claimants objected to Respondent's application to amend its request for relief. By email of 27 June 2019, the Respondent provided its observations on the Claimants' email of 24 June 2019, as per the Tribunal's instructions.
101.
On 28 June 2019, the Parties submitted their agreed corrections to transcripts of the Hearing and requested an extension until 15 July 2019 to revert on the accuracy of the translations filed on 26 May 2019. The Tribunal granted such extension on 30 May 2019.
102.
By letter of 1 July 2019, the Tribunal invited the Parties to address the merits of the Respondent's modification to the request for relief, without prejudice to its admissibility. Accordingly, the Respondent submitted its observations on 15 July 2019 and the Claimants filed their response on 26 July 2019.
103.
On 2 July 2019, the Centre circulated the final version of the Hearing transcripts.
104.
By letter of 8 July 2019, ICSID's Secretary-General informed the Parties that Mr. Abriani would serve as Secretary of the Tribunal during Ms. Bergamini's leave.
105.
On 15 July 2019, the Parties submitted the agreed text for exhibits R-40, R-41, R-43, R-44 and R-45, which were filed on 26 May 2019. On 19 July 2019, the Parties filed their statements of costs.
106.
By letter of 22 August 2019, the Tribunal provided the Parties with an update as to its deliberations and informed them that it expected to be able to indicate in early December when it would render its Award.
107.
The proceeding was closed on 8 November 2019.

III. FACTUAL BACKGROUND

108.
The following summary, which does not purport to be exhaustive, aims at providing the general factual background for the Tribunal's analysis. The Tribunal will address the facts relevant to its reasoning in more detail in Sections IV to VI.

A. OVERVIEW OF THE AGRICULTURAL LAND REGULATION IN HUNGARY

109.
Following the fall of the communist regime in Hungary in 1989, the Hungarian agriculture industry experienced a profound transformation. From 1990 to 1994, the State privatized a substantial portion of its farmland, dividing it into small individual parcels.23 At the end of the privatization process, over 85% of the agricultural land was privately owned, less than 15% remaining in State ownership. That being so, the division of land into small parcels stood in the way of mechanization and efficient farming. These factors seriously hampered the productivity of the Hungarian agriculture industry in the years that followed.
110.

To regulate the acquisition and ownership of the newly privatized agricultural land, on 27 June 1994, the Hungarian Parliament enacted the Arable Land Act (the "1994 Arable Land Act").24 Under the new Act, only physical persons of Hungarian nationality were authorized to acquire agricultural land, while domestic and foreign corporations, as well as foreign nationals were barred from such acquisition. The latter were, however, allowed to lease agricultural land from Hungarian nationals or from the State. Leases were limited to a maximum term of 10 years and a maximum surface area of 300 hectares.25 In addition, the 1994 Arable Land Act conferred a statutory pre-lease right on lessees of agricultural land in the following terms:

The ex-lessee shall be entitled to the right of pre-lease for the arable land taken on usufructuary lease, except if the contract of usufructuary lease ceased to exist as a consequence of termination by notice with immediate effect by the lessor.26

111.
In spite of the fragmentation of the agricultural land ownership into small parcels, under the new Act, certain large-scale farming enterprises managed to amass considerable portions of arable land by obtaining leases of private and State-owned land. As a result, by the end of the century, "[s]trong disconnection between land use and land ownership became a typical feature of the farming structure" in Hungary.27

B. THE CLAIMANTS' FARMING BUSINESS IN HUNGARY

112.
It was against this background that, in 1997, a group of British farming professionals led by Mr. Andrew Hunter decided to invest in the agricultural sector in Hungary.28 A tenant farmer's son from Yorkshire, Mr. Hunter managed a large agricultural enterprise in the UK.29 Together with his partners, Mr. Simon Weaver and Mr. Michael Papworth, Mr. Hunter travelled to Hungary several times in the summer of 1997 to visit several farms on sale.
113.
After going from farm to farm, Mr. Hunter and his partners came across a livestock farm owned by Inícia in the region of Ikrény, close to the Hungarian border with Austria and Slovakia. The farm had been privatized in 1994 by the statutory transformation of a State farming enterprise into a company limited by shares.30 It was composed of two livestock units and held a lease for approximately 760 hectares of State-owned land surrounding the livestock units. In addition, it had about 155 hectares of freehold agricultural land and approximately 300-400 hectares of privately leased land.31
114.
To facilitate the purchase of the farm, Mr. Hunter and his partners incorporated Magyar Farming Company Ltd as a holding company in the UK32 and Kintyre Agricultural Trade and Serice Kft as its Hungarian subsidiary. On 13 January 1998, Kintyre acquired 95.13% shares of Inícia for a purchase price of HUF 106.5 million.33 Mr. Hunter moved to Hungary as the managing director of the farm.
115.
Over the following 16 years, the Claimants transformed what they call "an indebted farm" into a successful agricultural enterprise.34 In 1998-99, the Claimants imported 696 pregnant heifers from Holland and renovated the existing cow accommodation, building a 304-cow cubicle shed, workshops and tractor sheds as well as a 3,000-ton grain store and straw shed.
116.
Apart from cow farming, the Claimants started producing potatoes and, in 2009, built a new 5,000-ton potato storage and packing facility. In 2011, the Claimants also constructed a 637kW biogas power plant, producing electricity from cow manure and supplying it to the national grid. The farm employed 45 local people and received various certificates of acclaim from local authorities.35

C. THE LEASE AGREEMENT AND THE PRE-LEASE RIGHT

117.

One of the assets that Inícia held when the Claimants acquired it in 1998 was the Lease.36 This was a ten-year profit lease ("haszonberlet") covering 760 hectares of State-owned land. Pursuant to the Civil Code of Hungary, a profit lease entitles the lessee in exchange of payment "to use and collect the proceeds of a designated parcel of agricultural land or some other profitable thing for a specific time".37 The lease was concluded in 1994 and was therefore due to expire in 2004. However, it provided for a pre-lease right:

At the request of the lessor, the tenant shall agree to the extension of the contract term, with the same business, payment and contractual conditions at least. In respect of these plots of land, the lessor grants a pre-lease right to the current tenant.38

118.

The Parties agree on the following general description of the pre-lease right under Hungarian law:

If a person has a pre-lease right over property, and the property owner intends to lease this property, then the owner must inform the holder of the pre-lease right about any offer from a third party that he or she intends to accept. Thereafter, the holder of the pre-lease right, by exercising the pre-lease right by unilateral declaration, may step in and assume the offer from the third party and thereby create a lease contract between the owner and the holder of the pre-lease right upon the terms offered by the third party.39

[…]

A pre-lease right is not an option to lease. The holder of the pre-lease right cannot oblige the owner to enter into a lease if the property owner does not want to lease out his or her property […] The owner does not have to offer the property first to the pre-lease right holder. The prelease right applies only if an offer has already been made for the lease of the property and the owner accepts such offer.40

119.

It is also common ground that a pre-lease right can be statutory or contractual. The former is a right created by law and existing irrespective of the Parties' agreement, while the latter is the result of an agreement and its scope and terms depend on the content of such agreement. In addition to the pre-lease provision in the Lease, Inícia had a statutory pre-lease right pursuant to the 1994 Arable Land Act, in the following terms:

The ex-lessee shall be entitled to the right of pre-lease for the arable land taken on usufructuary lease, except if the contract of usufructuary lease ceased to exist as a consequence of termination by notice with immediate effect by the lessor.41

120.
In 1999, Inícia and the State Privatization and Property Plc, an agency managing the State property, concluded an amendment to the Lease (the "1999 Lease Amendment"), which envisaged the conclusion of the renewed lease over the Land for a period of 10 years starting from 1 July 1999.42 The effect of the 1999 Lease Amendment was that the Lease, which was previously due to expire in 2004, was extended by five years to 2009. The language of the provision concerning the pre-lease right remained unaltered.
121.
In 2002, an amendment to the 1994 Arable Land Act modified the maximum permissible duration of agricultural leases from 10 to 20 years.43 Three years later, in April 2005, upon a reminder from the State Tenant Association, Inícia requested from the State a modification of the Lease in order to benefit from the new 20-year maximum duration.44 The NLA informed Inícia that the 20-year lease term would start running from the date of the original conclusion of the Lease in 1994, with the result that the renewed Lease would expire in 2014. Given that the expiry of the Lease was otherwise due in 2009, the proposed amendment would effectively extend the Lease by five more years. Therefore, Inícia went ahead with its request.
122.

On 16 November 2006, Inícia and the NLA thus entered into an amendment to the Lease (the "2006 Lease Amendment"), under which the Lease was extended to 25 July 2014.45 In addition, the 2006 Lease Amendment carved out a 75-hectare plot from the scope of the Lease.46 Most importantly, the new agreement modified the previous language of the pre-lease provision to read as follows:

With regard to the plots of land subject to the lease, the Tenant enjoys a pre-emption right and a pre-lease right that may be exercised in accordance with the applicable laws effective at all times, and which may not be registered in the Land Registry. […] Tenant is not entitled to exercise its pre-lease right, if the lease ceased to exist or was terminated for a cause arising on the side of the Tenant.47

123.
The Parties dispute the effect of the new language of the provision. In particular, they diverge on whether the 2006 Lease Amendment extinguished the contractual pre-lease right, leaving Inícia only with the statutory pre-lease right.

D. BACKGROUND AND ADOPTION OF THE 2011 AMENDMENT

124.
As described above, as a result of the privatization process, agricultural land in Hungary was fragmented into multiple small parcels owned mainly by private citizens and, in a smaller part, by the State. Large agricultural enterprises, such as Inícia, then leased many of those parcels for farming, given that enterprises were not themselves allowed to own agricultural land.
125.
In 1998, the Hungarian Civic Alliance ("Fidesz"), a national-conservative political party, came to power in Hungary. As it was unsatisfied with the established composition of the agricultural sector and, in particular, with the erosion of the rural population, the new government made agricultural land reform one of its main priorities. The reform was primarily aimed at "citizenisation of the countryside" by supporting "family-based agricultural businesses" so that "they c[ould] stay in competition with large companies."48
126.
Within the ambit of the reform, the government created the NLA, a management body for the State-owned agricultural land.49 In 2002, the Hungarian Parliament amended the 1994 Arable Land Act by introducing a ranking system for the exercise of pre-lease rights, granting priority to family farmers and local villagers, while placing former lessees, such as the Claimants, in an inferior position.50 As described above, this amendment also extended the maximum permissible duration of a lease from 10 to 20 years.
127.
The reform was, however, put on hold due to a change of government in 2002. The new socialist government re-amended the 1994 Arable Land Act to reinstitute the former system, placing former lessees first in the order of priority.51
128.
In 2004, Hungary's accession to the European Union further affected Hungarian small farmers, placing them at a competitive disadvantage with the significantly more developed European agriculture industry. This accelerated the ongoing process of erosion of the country's rural population.52
129.
Against this backdrop, the Fidesz government returned to power in 2010. It resumed the agricultural reform that was halted in 2002. On 12 August 2010, the Hungarian Parliament enacted the Act on the National Land Agency (the "2010 Act"). The 2010 Act mandated the re-distribution of the State-owned agricultural land with the aim of promoting "viable family farms".53 The implementation decree of the 2010 Act set out a procedure governing the tenders for leasing State-owned agricultural land.54 The procedure favored local family farms and individuals with professional agricultural credentials over large farming enterprises.
130.
At that time, the implementation decree maintained the existing pre-lease rights with the result that, if the winning bidder of the tender was not the same person as the pre-lease right holder, the NLA was to communicate to the pre-lease right holder, by way of public notice, the fact that a winning bid had been filed. If the pre-lease right holder then submitted an identical offer to the winning bid, the NLA would conclude the lease agreement with the pre-lease right holder instead of the winner of the tender.55
131.
According to the Respondent, the government soon realized that maintaining the pre-lease right for incumbent lessees contradicted the objectives of the land reform. In particular, it did not allow for the redistribution of the land to the favored categories of farmers, such as local, young (less than 40 years old) individuals or family entrepreneurs, holding agricultural qualifications and preferably being at a start-up stage. Even if such individuals managed to win tenders due to the ranking system that was favorable to them, the incumbent lessees with pre-lease rights could defeat the tender results by submitting a matching offer.56
132.

Therefore, on 9 July 2011, the Parliament amended the 2010 Act (the "2011 Amendment"), precluding the exercise of statutory pre-lease rights in cases where State-owned land was leased through a tender:

In case of leasehold of rural land or farm, a pre-lease right arising from legal regulations may not be exercised.57

133.
It is undisputed that this provision affected only statutory, as opposed to contractual prelease rights.

E. THE 2014 TENDERS

134.
Pursuant to the 2010 Act and its implementing directive, the NLA started organizing tenders for leasing State-owned agricultural land as the existing lease agreements were expiring. The process was named the "Land for Farmers Programme".
135.

The scoring system for the tenders was set out in the Instruction of the Minister of Agriculture.58 Apart from other criteria, such as the viability of the business plan and environmental conservation, the system favored local family farmers with agricultural diplomas and young farmers:

  Evaluation criteria Achieved score Evaluation weighting value Cumulated score
1. Candidate's economic situation      
1.1. Legal and structural form of the entity: Family fanner Individual agricultural entrepreneur: Primary poducer (if acquired the title) Cooperative, company or other commercial entity 10 8 7 3 1  
1.2. The ditance between the candidate's residence or seat and the applied plots of land (according to Section 11.2. j) of the Tender Notice) between 0-10 km between 10-20 km 10 8 2  
1.3. The candidate obtains a diploma relevant to the duties involved (yes/no): Yes / No 10 1 1  
1.4. The candidate's relevant farming experience: between 3-5 years between 5-10 years over 10 years 3 5 10 1  
136.
As set out above, the Lease was due to expire on 25 July 2014. Thus, starting from March 2013, the NLA announced a series of tenders for granting new leases over the Land. More precisely, in line with the objectives of promoting small family farms, the NLA divided the Land into 16 plots and announced a separate tender for each of the plots (the "Tenders").59 Pursuant to the 2011 Amendment, the announcement specified that the incumbent lessee could not exercise the pre-emption or pre-lease rights over the land forming the subject of the Tenders.60
137.
Concerned with the prospect of losing the Lease, in April 2013, the Claimants wrote to Hungary's Ambassador in London, describing the background of their investment in Hungary and highlighting the importance of stability of the Lease for the continuation of their business.61 The Embassy responded on 29 May 2013, stating that the problem of the renewal of lease contracts would be "satisfactorily resolved" by "the new Act".62
138.
According to the Claimants, the reference to "the new Act" was to the 2013 amendment to the 2010 Act (the "2013 Amendment"), which the Parliament had passed on 22 May 2013, a few days before the Embassy's letter. The 2013 Amendment granted the NLA a discretionary power to extend the duration of existing leases for lessees who benefitted from EU or national subsidies until they discharged their subsidy obligations.63 The Ministry of Rural Development clarified, however, that this possibility did not apply to leases that had already reached the statutory maximum duration of 20 years.64
139.
The Claimants attempted to take advantage of the 2013 Amendment by submitting a request to the NLA to renew the Lease for a period of five years, arguing that many national and EU subsidies they had received were contingent upon pursuing their farming activities beyond the expiration of the Lease in July 2014. On 9 July 2013, the NLA rejected the Claimants' request, stating that the 2013 Amendment conferred on it a discretion to renew lease agreements and that it was under no obligation to do so.65
140.
In addition to the exchanges with the Hungarian Embassy, on 30 May 2013, the Claimants attended a meeting organized by the British Embassy in Hungary. Mr. Hunter made a PowerPoint presentation of the Claimants' farming business in Hungary.66 The Claimants assert that, after the meeting, the Minister of Agriculture, Dr. Fazekas assured Mr. Hunter that "he could not see anyone entering the tender with a stronger claim, so Inícia just needed to enter the tender and there would be nothing to worry about."67
141.
Inícia thus submitted bids for the Tenders in June 2013.68 In January 2014, the NLA announced the results of the Tenders. All 16 of Inícia's bids were unsuccessful. The plots were awarded to local farmers. The names of the winning bidders were published on the NLA's website.69 In February 2014, the NLA proceeded to conclude 20-year lease agreements with the winners.70
142.
The Parties disagree on the reasons for Inícia's loss. The Claimants contend that the NLA awarded Inícia's bids artificially low scores in the discretionary component of the "professional and commercial well-foundedness of the business plan".71 The Respondent in turn suggests that Inícia's bids were unsuccessful as they were not overall in line with the policy-related criteria for awarding leases of the State-owned land, including the criteria that favored local and young family farmers. In addition, according to the Respondent, in five instances Inícia's bids were simply disqualified on the basis that they failed to attach all supporting documents that the tender rules required.72
143.
According to the 2015 statistical report of the Ministry of Agriculture, the tenders that the NLA conducted between 2010 and 2015 significantly altered the demographics of the State-owned land holding. Specifically, the number of tenants rose drastically by more than tenfold, from 600 in 2010 to 7500 in 2015. Nearly 85% of the new tenants were natural persons, and 21% of them were young farmers under the age of 40.73

F. DOMESTIC PROCEEDINGS

144.
On 31 January and 5 February 2014, after the announcement of the results of the Tenders, Inícia wrote to the NLA, affirming the entitlement "to the pre-lease right established in Section 5.1 of the lease agreement concluded with the National Land Agency on 26 November 2006".74 Inícia also requested the NLA to disclose the content of the winning bids. The NLA did not respond.
145.
In May 2014, a Hungarian court ordered the NLA, upon Inícia's application, to disclose the winning bids,75 but the NLA failed to comply. After Inícia engaged bailiffs to enforce the court's order, the NLA disclosed the winning bids in March 2017.76
146.
In addition, Inícia commenced court proceedings to obtain disclosure of the scoring sheets for the Tenders.77 The first instance court ordered the NLA to disclose the documents on 27 October 2017.78 The second instance court confirmed the order on 31 January 2018.79 The Respondent requested an ex parte extraordinary review of the second instance court decision by the Supreme Court (also referred to as the "Curia"), which is still pending. In the meantime, however, the Tribunal ordered the Respondent to disclose the scoring sheets in a document production exercise in this arbitration. The Respondent complied with the order.80
147.
Separately, on 29 April 2014, Inícia formally notified the NLA that it exercised the pre-lease rights and requested the NLA to sign lease agreements with Inícia "with the same conditions as were granted to the winning tender applicants".81 Receiving no response, on 6 June 2014, Inícia filed an action against the NLA and the winners of the Tenders before the first instance court at the Pest district, requesting the judicial recognition of its exercise of the pre-lease right under Section 5.1 of the Lease and enjoinment of the NLA to conclude lease agreements with Inícia upon the terms of the winning bids.
148.

The dispute was entertained at all levels of the Hungarian judiciary and involved the following steps:

• The first instance court of the district of Pest dismissed Inícia's claims on 21 October 2014.82 The court primarily based its decision on the fact that the winners of the Tenders were acting in good faith, without the knowledge of Inícia's claims in relation to the Land.

• Inícia appealed the first instance court's judgment before the second instance court (also referred to as the "Metropolitan Court"). The Metropolitan Court dismissed the appeal on 12 November 2015, finding that the language of the Lease and in particular the new language of the pre-lease clause introduced by the 2006 Lease Amendment did not grant Inícia a contractual pre-lease right.83

• Inícia then initiated a review procedure before the Supreme Court. On 25 January 2017, Panel V of the Curia annulled the Metropolitan Court decision due to a lack of sufficient reasoning and remanded the case back to the Metropolitan Court for reconsideration.84

• On 7 December 2017, the Metropolitan Court once again dismissed Inícia's claims.85 The court relied on the interpretation of a similar pre-lease provision that another panel of the Curia, Panel VI, gave in a separate case (so-called Szellőhát Case).86

• Inícia filed a request for extraordinary review with the Curia, which is still pending.87

G. EVICTION

149.
A few days prior to the expiry of the Lease, on 21 July 2014, the NLA wrote to Inícia, expressing the intention to retake the possession of the Land.88
150.
On 24 July 2014, Inícia obtained an order from the local municipality89 granting protection against eviction pending resolution of the proceedings that Inícia had started before the District Court of Pest.90
151.
Nevertheless, on 25 July 2014, two NLA representatives arrived at the farm and invited Inícia to sign a minute recording the takeover of the Land. Mr. Hunter signed the minute with a written reservation that Inícia would not hand over the Land since it had properly exercised the pre-lease right and had obtained the protective order from the local municipality the day before.91
152.
Inícia subsequently obtained, on 31 July and 5 August 2014, three further orders from the local municipality granting protection against eviction pending the resolution of the court proceedings.92
153.
Nevertheless, the NLA purported to transfer physical possession of the land to the winners of the Tenders on 16 October 2014. Inícia refused to leave. The winners started arriving at the Land with their tractors to do seasonal works. This gave rise to a number of unpleasant incidents. According to the Respondent, on one occasion, Mr. Hunter physically assaulted a farmer.93
154.
In turn, the Claimants contend that in an attempt to intimidate Mr. Hunter, the Respondent arrested him in February 2015. According to Mr. Hunter's testimony, he was taken to the local police station without any explanation. His request for access to a lawyer was denied. He was released the following morning without charge or any explanation for his detention.94
155.
The winners of the Tenders in turn obtained possessory protection against Inícia from local notaries. Inícia sought to overturn the notarial order before the first instance court in Győr. On 21 May 2015, the court dismissed Inícia's request, finding that, "[n]otwithstanding the dispute regarding the pre-lease right […] the claimant [Inícia] has no valid legal title" and thus the NLA "may request [Inícia] to cease the nuisance."95
156.
The confrontations between the new lessees and the Claimants lasted for almost a year. Finally, on 14 July 2015, the State Secretary of the Ministry of Agriculture, Dr. Márton Bitay, appeared in the fields with a television crew and armed private security guards. He vowed to "protect the Hungarian agricultural land under all circumstances, not only legally, but physically as well".96 The security guards remained on the Land to ensure Inícia's eviction and the harvesting of crops by the winners of the Tenders. In the end, Inícia was forced to abandon the Land.
157.
Since the eviction, Inícia continues its farming activities on the remainder of the land that it owned or leased from private owners. The Parties dispute the impact that the eviction from the Land had on the Claimants' farming business in Hungary.

H. SETTLEMENT EFFORTS

158.
On 11 February 2014, shortly after the results of the Tenders had been announced, the British Ambassador, Jonathan Knott, met with Dr. Márton Bitay of the Ministry of Agriculture (also referred to as the "Ministry of Rural Development") to discuss the position of the British farmers in Hungary in the face of the agricultural reform.97 In a follow up letter, Dr. Bitay wrote to the Ambassador, pointing out that the farmers had enough time to adjust to the new realities after the 2011 Amendment. Dr. Bitay suggested that if the farmers wished to offer their farms for sale to the Hungarian State, they should have contacted Dr. Sándor Fazekas, Minister of Agriculture Hungary.98
159.
Inícia's legal representatives from PricewaterhouseCoopers Legal ("PWC") thus wrote to Dr. Fazekas on 10 April 2014 offering to sell Inícia's shares for HUF 4.95 billion (approx. EUR 16 million).99 On 30 May 2014, Dr. Bitay acknowledged receipt of the Claimants' offer.100 After several months of silence, on 16 September 2014, Inícia re-submitted its offer.101
160.
On 6 November 2014, the British Ambassador met again with Dr. Bitay. According to the Embassy's notes, Dr. Bitay saw a contradiction in Inícia's actions, as it purported to negotiate with the State, while at the same time litigating before the Hungarian courts.102
161.
On 24 November 2014, Dr. Gyula Budai, the State Secretary at the Ministry of Agriculture, wrote to the British Ambassador stating that there was "nothing in the way [of] beginning the acquisition negotiations, however, the documentation provided by Inícia did not contain sufficient information for the evaluation of the business case."103
162.
In January 2016, Prime Minister Cameron and Prime Minister Orbán reached a "gentlemen's agreement" that the Respondent would buy the Claimants' farm.104 In light of this agreement, Dr. Budai met with the British Ambassador on 3 February 2016. At the meeting, Dr. Budai suggested that the Claimants had two courses of action. First, the State could purchase their farm in exchange of compensation. Second, the Claimants could secure new leases for other comparable State-owned land plots, for which Mr. Hunter could participate in auctions announced by the NLA.105
163.
However, on 13 April 2017, the Claimants received a letter from the Hungarian National Asset Management Agency ("MNV") stating that "the acquisition of ownership in Inícia […] for the benefit of the Hungarian state […] [did] not fit into the government's current strategic plans and goals."106 On 27 April 2017, the British Ambassador swiftly arranged a meeting with Dr. Budai, who assured him that the option of purchasing the Claimants' farm was still on the table.107
164.
In the meantime, the Respondent retained KPMG to value the Claimants' Hungarian subsidiaries, Kintyre and Inícia. According to the Respondent, KPMG's highest valuation came to HUF 1.7 billion for the two companies (approximately USD 6.2 million at the rates in effect at the time). According to Mr. Hunter, he was allowed to consult the report on 10 July 2017 upon signing a non-disclosure agreement, and when he asked KPMG why the valuation was so low, he was told that it was due to the farm's shortage of land.108
165.
After exchanges spanning over a period of almost three years, on 3 July 2017, the MNV communicated its counter-proposal to purchase the farm for HUF 700 million (EUR 2.2 million) to the Claimants.109 Given the stark difference between the proposals, the Parties failed to reach an agreement. The Claimants thus initiated the present arbitration on 4 July 2017.
166.
The Parties dispute the impact of the loss of the Land on the Claimants' farming business. While the Claimants assert that Hungary's measures rendered their farm "unsaleable"110, the Respondent points to the fact that the Claimants continue to derive profit from their Hungarian farm to this day.111

IV. JURISDICTION

167.
The Respondent raises two jurisdictional objections. First, it contends that its consent to arbitrate contained in the BIT was rendered inapplicable by Hungary's accession to the EU in 2004 and therefore there is no valid arbitration agreement (A). Second, it claims that the present dispute does not arise out of an investment that would be capable of being expropriated and thus the dispute is outside the subject-matter scope of the BIT and the ICSID Convention (B). Beyond those objections, which will be dealt with below, the Parties do not dispute the jurisdiction of the Centre or the competence of the Tribunal, and rightly so.
168.

It is undisputed that the Tribunal has the authority to resolve the objections to its competence and the jurisdiction of the Centre pursuant to Article 41 of the ICSID Convention, which reads as follows:

(1) The Tribunal shall be the judge of its own competence.

(2) Any objection by a party to the dispute that that dispute is not within the jurisdiction of the Centre, or for other reasons is not within the competence of the Tribunal, shall be considered by the Tribunal which shall determine whether to deal with it as a preliminary question or to join it to the merits of the dispute.

169.
Accordingly, the Tribunal will deal with each of the Respondent's objections in turn.

A. INTRA-EU OBJECTION

170.
It is common ground that Article 8 of the BIT contains Hungary's consent to arbitration.112 The Parties dispute, however, whether that consent was rendered inapplicable by Hungary's accession to the EU and its consequent ratification of the Treaty on the European Union ("TEU") and the Treaty on the Functioning of the European Union ("TFEU") (together the "EU Treaties").

(1) The Respondent's Position

171.
The Respondent submits that the Tribunal lacks jurisdiction since the BIT's offer to arbitrate, which the Claimants purported to accept by their trigger letter of 12 November 2015 and in the Request for Arbitration,113 had long been extinguished by virtue of Hungary's accession to the EU Treaties in 2004.

a. Article 8 BIT is incompatible with the EU Treaties

172.

The Respondent contends that the BIT's dispute resolution provision is incompatible with the EU Treaties. It primarily relies on the decision of the Court of Justice of the European Union (the "CJEU") in Slovak Republic v. Achmea B.V. (the "Achmea Decision"),114 in which the CJEU determined that the dispute resolution provisions in the investment treaties concluded between the EU Member States were contrary to the EU Treaties:

Articles 267 and 344 TFEU must be interpreted as precluding a provision in an international agreement concluded between Member States, such as Article 8 of the Agreement on encouragement and reciprocal protection of investments between the Kingdom of the Netherlands and the Czech and Slovak Federative Republic, under which an investor from one of those Member States may, in the event of a dispute concerning investments in the other Member State, bring proceedings against the latter Member State before an arbitral tribunal whose jurisdiction that Member State has undertaken to accept.115

173.
According to the Respondent, the Achmea Decision is dispositive of the incompatibility between the BIT's dispute resolution provision and the EU Treaties, since the CJEU decisions have erga omnes effect vis-à-vis all EU Member States.116 This was confirmed by the 2019 Declarations as issued by 23 EU Member States, including Hungary and the UK, affirming that "all investor-State arbitration clauses contained in bilateral investment treaties concluded between Member States are contrary to Union law and thus inapplicable."117 As the PCIJ held in the Jaworzina opinion, the treaty-making parties "acting in consensus remain the masters of their treaty and can, therefore, determine its meaning with binding force."118
174.

According to Hungary, the Claimants are asking the Tribunal to ignore the authoritative decision of the CJEU and the binding interpretation given by the BIT's Contracting States. This request should be rejected as, contrary to the Claimants' arguments, there is no reason for a different conclusion. More specifically, Hungary makes the following submissions:

• While the Claimants rely on the fact that this is an ICSID arbitration, unlike the one at issue in the Achmea Decision (the "Achmea Arbitration"), this is all the more reason to follow the analysis of the Achmea Decision. There, the CJEU reasoned that the courts of the Member States did not retain sufficient control over the Achmea Arbitration in respect of the application of EU law, despite the fact that the arbitration was seated in Frankfurt and that Member State courts had jurisdiction over the ensuing award in set aside and enforcement proceedings. In turn, the Contracting States of the ICSID Convention are arguably under an obligation to enforce ICSID awards without scrutinizing them even for the limited ground of public policy.119 The absence of substantive review of the application of EU law by courts sitting within the EU system is precisely the reason why the Achmea Decision held that there was an incompatibility between the intra-EU BITs and the EU Treaties. This incompatibility is amplified in the ICSID context.

• The Claimants' contention that the existence of the conflict between Article 8 of the BIT and the EU Treaties should be viewed from the public international law perspective is uncontested but does not change the fact that there is an incompatibility between these successive treaties. As a result of the Achmea Decision, the incompatibility is itself a rule of public international law. In this respect, the Claimants' reliance on pre-Achmea investment awards is misguided, as the value of these awards cannot be compared with that of a CJEU decision. Again, the CJEU determines the content of the EU Treaties with mandatory and erga omnes effect.

• The Claimants' argument that the BIT and the EU Treaties do not regulate the same subject matter and therefore one cannot prevail over the other under Article 30(3) of the Vienna Convention on the Law of Treaties ("VCLT") is also unavailing. Scholars suggest that the notion of subject matter must be understood broadly, because a strict interpretation "leads to a reductio ad absurdum."120

• Similarly, the Claimants' argument that the Achmea Decision was based on a different BIT "in which, unlike the UK-Hungary BIT, the law of an EU Member State was expressly incorporated as part of the governing law"121 is inapposite. On the basis of Article 42 of the ICSID Convention, in the absence of a choice of law in the treaty, the law of the host State, including EU law applies to the merits of the dispute. This difference between the BIT applicable here and the Slovak-Netherlands BIT at issue in the Achmea Decision is, therefore, immaterial.122

175.
For these reasons, according to Hungary, the Claimants' reliance on the pre- Achmea decisions of investment tribunals, such as Electrabel v. Hungary,123 and RREEF Infrastructure v. Spain124 is unavailing as those decisions were not informed by the CJEU's authoritative interpretation of the EU Treaties.

b. The EU Treaties prevail

176.
The Respondent contends that the incompatibility between Article 8 of the BIT and the EU Treaties should be resolved in favor of the EU Treaties, as the CJEU authoritatively determined in the Achmea Decision. More specifically, the EU Treaties are later in time and should prevail pursuant to Article 30(3) of the VCLT, which contains the rule that lex posterior derogat priori. Contrary to the Claimants' assertion, it does not matter that the EU Treaties may have been in effect in some form since the 1957 Treaty of Rome. What matters, according to Hungary, is that it acceded to the EU in 2004 and the EU Treaties then became applicable between Hungary and the UK.125 Thus, in respect of the BIT, the EU Treaties constitute a lex posterior.126
177.

Another conflict of treaties rule also speaks in favor of EU Treaties, namely the rule found in Article 30(2) of the VCLT, which reads as follows:

When a treaty specifies that it is subject to, or that it is not to be considered as incompatible with, an earlier or later treaty, the provisions of that other treaty prevail.

178.
Article 351 of the TFEU is precisely the type of rule envisaged by Article 30(2) of the VCLT. It provides that the obligations set out in the EU Treaties prevail over those contained in agreements concluded prior to the accession to the EU.
179.
For the Respondent, the Claimants read Article 351 of the TFEU incorrectly when they argue that it "only applies to agreements between EU Member States and ‘third countries'" and not to agreements between EU Member States. That argument is belied by consistent case law of the CJEU.127 The Claimants' reliance on Vattenfall v. Germany is unhelpful. In that case, the ICSID Tribunal found that there was no conflict between the Energy Charter Treaty's dispute resolution provision and the EU Treaties. It was therefore unnecessary to apply Article 351 of the TFEU.
180.
Had the Vattenfall tribunal wished to assess the meaning of Article 351 of the TFEU, the Respondent submits that it would have relied on the CJEU's binding interpretation of this provision. Even if the Vattenfall tribunal had conducted a full analysis under treaty law, it would have concluded that this provision applies to treaties between EU Member States.
181.
As for the Claimants' argument that it was incumbent upon Hungary and the UK to eliminate any incompatibilities between the BIT and the EU Treaties, the Respondent suggests that there exists no international obligation on States to remedy an incompatibility between successive treaties. Instead, the incompatibility is dealt with by Article 30(3) of the VCLT, which is clear in that the later treaty shall prevail. Therefore, no inferences can be drawn from the fact that the EU Member States have not formally amended or renounced their intra-EU BITs.128
182.
Further, for Hungary, the Claimants erroneously invoke Article 11 of the BIT, which provides in relevant part that "[i]f the […] obligations under international law […] contain rules, whether general or specific, entitling investments by investors of the other Contracting Party to a treatment more favourable than is provided for by the present Agreement, such rules shall to the extent that they are more favourable prevail over the present Agreement."129 The Claimants wrongly suggest that this is a subordination clause of the type contemplated in Article 30(2) of the VCLT. Apart from the fact that Article 11 of the BIT does not at all address a conflict with other treaties, it only allows the application of more favorable "treatment" to the "investment". It does not deal with procedural mechanisms. Indeed, access to arbitration does not qualify as "treatment" of an investment but constitutes a procedural right.130
183.
In any event, even if Article 11 were deemed a conflict rule, according to the Respondent, it would be in direct contradiction with Article 351 of the TFEU, which is a later conflict rule applicable between Hungary and the United Kingdom.
184.
As to the Tribunal's question on the possible impact of the UK's announced withdrawal from the EU ("Brexit") jurisdiction must be assessed, so says Hungary, by reference to the date of the institution of the arbitral proceedings. At that time, the UK was an EU Member. In addition, despite Brexit, the UK subscribed to the 2019 Declarations, vowing to "take the necessary measures to inform [arbitral tribunals]" that "[Article 8 of the BIT is] contrary to Union law and thus inapplicable."131
185.
Finally, contrary to the Claimants' contention, the Respondent argues that the principles of good faith and estoppel would not justify upholding jurisdiction in the circumstances of this case. The Claimants' good faith, which is not disputed, is not a reason for the Tribunal to rewrite the law and assume jurisdiction without the Respondent's consent.132 As for estoppel, under international law a party must make a clear statement or engage in consistent conduct on which the other party relies to its own detriment.133 The Claimants do not even come close to establishing that Hungary made a statement or engaged in conduct suggesting the compatibility of the BIT with the EU Treaties, and that the Claimants acted in reliance on such conduct.

(2) The Claimants' Position

186.
The Claimants submit that there is a valid arbitration agreement between the Parties, as they accepted the Respondent's offer to arbitrate contained in Article 8 of the BIT. Article 8 of the BIT contained a valid offer at the time when it accepted it by a letter of 12 November 2015 and in the Request for Arbitration of 4 July 2017. Indeed, (a) that provision is compatible with the EU Treaties, and (b) in any event, the EU Treaties do not prevail over the BIT.

a. Article 8 BIT is compatible with the EU Treaties

187.

The Claimants contend that the Achmea Decision is not binding on this Tribunal, which should conduct an independent inquiry into its own jurisdiction under Article 41(1) of the ICSID Convention. As numerous investment treaty tribunals have made clear, this inquiry must be conducted under public international law and not exclusively under EU law.134

188.

It is also well-established in investment treaty jurisprudence that the dispute settlement provisions in investment treaties are easily reconcilable with the EU Treaties,135 and in particular with Articles 344 and 267 of the TFEU. These provisions read as follows:

Article 344

Member States undertake not to submit a dispute concerning the interpretation or application of the Treaties to any method of settlement other than those provided for in the Treaties.

[...]

Article 267

The Court of Justice of the European Union shall have jurisdiction to give preliminary rulings concerning:

(a) the interpretation of the Treaties;

(b) the validity and interpretation of acts of the institutions, bodies, offices or agencies of the Union.

189.
In the Claimants' submission, these provisions relate to actions brought by the Member States and say nothing about private parties bringing claims regarding the interpretation and application of a BIT. The test of incompatibility under the VCLT is strict and "the mere fact that there was a difference between the provisions of a later treaty and those of an earlier treaty d[oes] not necessarily mean that there exist[s] an incompatibility".136
190.
The Claimants further observe that the finding of incompatibility in the Achmea Decision was based on the Netherlands-Slovakia BIT which, different from the UK-Hungary BIT, chose the law of an EU Member State as part of the governing law. Although the Achmea Decision contains general language applying to other investment treaties "such as" the Netherlands-Slovakia BIT, the words "such as" should be construed to refer only to ISDS clauses in investment treaties that contain governing law clauses similar to that of the Netherlands-Slovakia BIT.

b. The EU Treaties do not prevail

191.
Even if there were a conflict between Article 8 of the BIT and the EU Treaties, the Claimants submit that the latter would not prevail. The temporal conflicts rule contained in Article 30(3) of the VCLT only applies to successive treaties with the same subject matter. It is well established in public international law that this "expression ‘relating to the same subject-matter' must be construed strictly" and that it does "not cover cases where a general treaty impinges indirectly on the content of a particular provision of an earlier treaty."137 Many tribunals have made the obvious point that the subject matter of investment treaties is different from that of the TFEU, which concerns the functioning of the European Union.138 Therefore, the EU Treaties would not prevail over the BIT, even if they were in conflict.
192.
Even if Article 30(3) is applied, it is unclear to the Claimants how the EU Treaties can be considered later in time than the BIT. In Vattenfall v. Germany, the ICSID tribunal noted that "Articles 267 and 344 TFEU have existed in substantively similar form" as part of the Treaty of Rome of 1957. Hence, for that tribunal "it [was] by no means clear that the EU Treaties [were] the ‘later treaty' under Article 30 VCLT."139
193.

In addition, the Claimants submit that the BIT should prevail over the EU Treaties pursuant to Article 30(2) of the VCLT. In particular, the Claimants suggest that Article 11 of the BIT is a subordination clause envisaged by Article 30(2) of the VCLT. The relevant part of Article 11 to which the Claimants refer reads as follows:

If [...] obligations under international law [...] established hereafter between the Contracting Parties in addition to the present Agreement contain rules, whether general or specific, entitling investments by investors of the other Contracting Party to a treatment more favourable than is provided for by the present Agreement, such rules shall to the extent that they are more favourable prevail over the present Agreement.140

194.
For the Claimants, the obvious a contrario reading of Article 11 is that the parties to the BIT intended the BIT to prevail to the extent that any later treaty offered less favorable treatment to the investments of investors. If the rules of the EU Treaties render Article 8 of the BIT inapplicable, then such rules would clearly result in less favourable treatment for the Claimants, and therefore the BIT terms would prevail.
195.
In this connection, the Claimants consider the Respondent's invocation of Article 351 of the TFEU ill-conceived. As the Vattenfall v. Germany tribunal clarified, this provision, which obliges the EU Member States to eliminate incompatibilities with other treaties, applies to the treaties which bind EU Member States to third countries.141 According to the Claimants, the Respondent admitted as much in the Rejoinder.142 In any event, Article 351 TFEU does not render incompatible provisions automatically inapplicable, but instead makes it incumbent upon the Member States to remedy such incompatibilities. In the present case, the Respondent has not done so before the Claimants accepted the offer to arbitrate. Given that an arbitration agreement was concluded, it is no longer open to the Respondent to renege on the offer.
196.
The Claimants further reject the Respondent's interpretation of the 2019 Declarations that the EU Member States issued as a result of the Achmea Decision. As a matter of public international law, these declarations are a non-binding expression of the States' intention to undertake future actions.143 They do not constitute joint interpretative statements or notes clarifying the meaning of Article 8 of the BIT and can certainly not remove the consent to arbitrate given in an international treaty. Even if the 2019 Declarations were considered to be joint interpretative statements, they would not be binding upon this Tribunal. Such statements are only one of the interpretative tools available under the VCLT. They fall under Article 31(3)(a) of the VCLT which provides that in interpreting a treaty "any subsequent agreement between the parties […] shall be taken into account." However, such interpretative agreements cannot change the plain ordinary meaning of the treaty text.
197.
In connection with the Tribunal's question concerning the UK's withdrawal from the EU, the Claimants agree with the Respondent that jurisdiction must be assessed on the date of the commencement of the present proceedings.144 That said, they point to the Respondent's "hypocritical" position, which disregards events postdating the commencement of the arbitration, such as Brexit, and at the same time relies on other post-commencement events, such as the Achmea Decision and the 2019 Declarations.145
198.
Finally, the Claimants insist that reasons of good faith and justice mandate the Tribunal to assume jurisdiction under Article 8 of the BIT. In particular, by statements (e.g., "the unexpected outcome in the Achmea decision")146 and conduct (e.g., failing to take any steps to amend, suspend or terminate Article 8 and electing not to file any equivalent jurisdictional objection in the Accession v. Hungary case filed in 2011 under the same BIT)147, the Respondent tacitly accepted that Article 8 of the BIT was still in force on the institution of these proceedings.
199.
Thus, so argue the Claimants, it would be manifestly unjust under the present facts if they were deprived of access to arbitral justice due to an alleged incompatibility between EU Treaties and the Respondent's unambiguous expression of consent in Article 8 of the BIT.148

(3) Analysis

200.

Article 25 of the ICSID Convention requires inter alia that the respondent State and the national of another Contracting State consent in writing to arbitrate their dispute:

The jurisdiction of the Centre shall extend to any legal dispute arising directly out of an investment, between a Contracting State (or any constituent subdivision or agency of a Contracting State designated to the Centre by that State) and a national of another Contracting State, which the parties to the dispute consent in writing to submit to the Centre.149

201.

When the Claimants served their request for arbitration on 4 July 2017, they purported to accept Hungary's offer to arbitrate which is embodied in Article 8 of the BIT and reads as follows:

Each Contracting Party hereby consents to submit to the International Centre for the Settlement of Investment Disputes (hereinafter referred to as "the Centre") for the settlement by conciliation or arbitration under the Convention on the Settlement of Investment Disputes between States and Nationals of other States opened for signature at Washington on 18 March 1965 any legal dispute arising under Article 6 of this Agreement between that Contracting Party and an investor of the other Contracting Party concerning an investment of the latter in the territory of the former.150

202.
Hungary objects that, at the time of the Claimants' acceptance, the offer was no longer valid due to Hungary's accession to the EU Treaties in 2004.
203.
The Parties agree that the question whether the EU Treaties override the dispute resolution clause of the BIT must be assessed under international law, and rightly so. Indeed, the BIT's offer to arbitrate is contained in an international treaty, and its validity and interpretation is governed by the VCLT of which Hungary and the UK are both contracting parties. In addition, this arbitration is conducted under the ICSID Convention and, thus, is not subject to a national legal system. As a result, the validity of the arbitration agreement or arbitrability of the dispute is not governed by a national lex arbitri. Therefore, for the purposes of the present case, the Tribunal does not need to consider the consequences, if any, of the application of a particular national lex arbitri to the dispute or the arbitration agreement.
204.
Before analyzing whether the EU Treaties preclude the application of Article 8 of the BIT pursuant to the VCLT (c), the Tribunal will address the Respondent's argument that this Tribunal is bound by the Achmea Decision (a) and the 2019 Declarations (b).

a. Is the Achmea Decision binding on the Tribunal?

205.
In its judgment in Achmea issued on 6 March 2018, the CJEU held that "Articles 267 and 344 [of the] TFEU must be interpreted as precluding a provision in an international agreement concluded between Member States [...] under which an investor from one of those Member States may, in the event of a dispute concerning investments in the other Member State, bring proceedings against the latter Member State before an arbitral tribunal whose jurisdiction that Member State has undertaken to accept."151
206.
According to Hungary, the Achmea Decision did not change the content of the existing law. Instead, "[t]he Achmea Decision has only said what the law was all along."152 For the Respondent, since both Hungary and the UK empowered the CJEU to determine the interpretation and application of the EU Treaties and accepted to be bound by such determination, "the Achmea Court's interpretation of Articles 267 and 344 is an authoritative interpretation", with the result that "as a matter of law, there is no scope for reinterpreting".153
207.

The Tribunal is not convinced that it is bound by the CJEU's decision over the conflict between the BIT and the EU Treaties. Under Article 41 of the ICSID Convention, the UK, Hungary and the other 155 contracting States, including non-EU States, agreed that an arbitral tribunal constituted under the ICSID Convention "shall be the judge of its own competence", and that:

Any objection by a party to the dispute that that dispute is not within the jurisdiction of the Centre, or for other reasons is not within the competence of the Tribunal, shall be considered by the Tribunal […].154

208.
In other words, the ICSID Convention empowers tribunals acting under its aegis to decide over their own jurisdiction, that is to say that it grants them Kompetenz-Kompetenz. In the exercise of such power, the Tribunal must analyze whether there is a valid consent to arbitrate under Article 25 of the ICSID Convention. An ICSID tribunal cannot abandon this mandate and blindly follow the determination of another adjudicatory body. It must carry out its own analysis.
209.
In any event, the CJEU's interpretative authority extends to the interpretation and application of the EU Treaties.155 The CJEU has no such (arguably) exclusive or ultimate mandate in respect of the interpretation of the BIT or the VCLT rules on treaty conflicts. Yet, in order to determine whether Article 8 of the BIT is precluded by the EU Treaties, it does not suffice to interpret the EU Treaties. This determination requires the interpretation of both the EU Treaties and the BIT, in order to answer crucial questions such as (i) whether the BIT and the EU Treaties govern the same subject matter as provided in Article 30 of the VCLT and, if so, (ii) whether there is a normative conflict between these treaties as understood under the VCLT.
211.
For these reasons, the Tribunal is bound to undertake an independent analysis as to whether the EU Treaties override the consent to ICSID arbitration given in the BIT, which analysis is subject to the VCLT.

b. What is the value of the Member States Declarations?

212.
In January 2019, 23 EU Member States, including Hungary and the UK, made declarations affirming that "all investor-State arbitration clauses contained in bilateral investment treaties concluded between Member States are contrary to Union law and thus inapplicable."157 The Parties dispute the legal value of the 2019 Declarations.
213.
The Respondent submits that the Contracting States are the masters of the treaty. In general, the Tribunal agrees with this statement. Indeed, when the Contracting States are in agreement, they may even go as far as to terminate the treaty.158 That said, the UK and Hungary have not terminated the BIT pursuant to the rules of Section 3 of the VCLT. Even if they had done so by virtue of the 2019 Declarations, however, the Claimants accepted the BIT's offer to arbitrate prior to its purported termination. Pursuant to Article 25 of the ICSID Convention, "[w]hen the parties [i.e. the investor and the State] have given their consent, no party may withdraw its consent unilaterally." Indeed, it is common ground between the Parties that the relevant time for determining jurisdiction is the date of the initiation of the arbitration.
215.
The 2019 Declarations might also arguably be viewed as a "subsequent agreement between the parties regarding the interpretation of the treaty", as envisaged by Article 31(3)(a) of the VCLT. This seems to be the Respondent's position, which states that the 2019 Declarations are "a clarification of the meaning and the effect that these [treaties] have always had. It is not a forward-looking policy statement […]. It is a statement of what they understand the law to have been since the treaties came into effect."159
216.
However, the 2019 Declarations themselves are not clear on whether they purport to offer a joint interpretation of the intra-EU BITs. In pertinent part, their title reads: "Declaration […] on the Legal Consequences of the Judgment of the Court of Justice in Achmea and on Investment Protection in the European Union."160 This wording suggests that the Member States seek to explain the legal consequences of the Achmea Decision, rather than to give an interpretation of the meaning of intra-EU investment treaties.
217.
This suggestion is corroborated by the fact that, prior to the Achmea Decision, Hungary participated in an ICSID arbitration under the present BIT without objecting that Article 8 was extinguished due to its accession to the EU.161 This instance shows that Hungary did not consider that its offer to arbitrate expressed in the BIT had ceased to be effective as a result of its accession to the EU. Instead, as the title of the 2019 Declarations demonstrates, such ineffectiveness or extinguishment is presented as a consequence of the Achmea Decision. Yet, as discussed above, the Claimants accepted Hungary's offer to arbitrate prior to the Achmea Decision. Hence, according to Article 25 of the ICSID Convention, it is no longer open for Hungary to renege on this consent.
218.

Be that as it may, joint interpretative declarations or agreements are not an exclusive and dispositive method of treaty interpretation. Pursuant to Article 31(3) of the VCLT they are but one circumstance that "shall be taken into account, together with the context" of the relevant treaty terms. What is more, context is itself one of the means of interpretation under Article 31(1) of the VCLT, together with the ordinary meaning and object and purpose of the treaty. Thus, an interpretative declaration, as its name indicates, can only interpret the treaty terms; it cannot change their meaning:

Unlike interpretation, the subsequent modification of a treaty can hardly be left to informal agreements as the amendment must be on the same legal level as the original treaty as foreseen in the treaty.162

219.

Here, the provision that is purportedly subject to interpretation is Article 8 of the BIT, which was already quoted and reads as follows:

Each Contracting Party hereby consents to submit to the International Centre for the Settlement of Investment Disputes (hereinafter referred to as "the Centre") for the settlement by conciliation or arbitration under the Convention on the Settlement of Investment Disputes between States and Nationals of other States opened for signature at Washington on 18 March 1965 any legal dispute arising under Article 6 of this Agreement between that Contracting Party and an investor of the other Contracting Party concerning an investment of the latter in the territory of the former.163

220.

The ordinary meaning of the language of this provision leaves no doubt that it contains binding consent (in the meaning of offer) to ICSID jurisdiction. The Respondent accepts the binding nature of this offer when it states in so many words that "Hungary never denied that "‘consents' means consents"" and that "Hungary obviously intended to and did consent to the submission of disputes to ICSID arbitration when it signed the BIT."164 If Hungary and the UK intended to modify the words of an international treaty ratified by both of them, issuing an interpretative declaration by representatives of their governments was not a suitable means for achieving that purpose. If it had been their intent to amend the express language of the BIT, the States would have chosen a different course. The Member States obviously acknowledge that they cannot modify existing BITs by mere declarations, when they state in the 2019 Declarations:

Member States will make best efforts to deposit their instrument of ratification, approval or acceptance […] of any bilateral investment treaty terminating bilateral investment treaties between Member States no later than 6 December 2019.165

221.
Had the 2019 Declarations been sufficient to change the BITs, then the termination of such treaties would be superfluous. In this respect, the Tribunal agrees with the ICSID tribunal in United Utilities v. Estonia that the language of the 2019 Declarations "necessarily implies […] that the BIT remains in force and that its Article 9 [comparable to Article 8 here] can therefore constitute a valid offer to arbitrate, which Claimants accepted."166
223.
This provision shows that, even where the Contracting Parties terminate the treaty on mutual consent, they acknowledge that long-term interests of investors who have invested in the host State in reliance on the treaty guarantees must be respected. This is the purpose served by the 20-year sunset provision. If the protection of existing investments outlives an unambiguous termination of the Treaty, then the protection must continue a fortiori in respect of a decision of an adjudicatory body constituted under a different treaty or of declarations that purport to clarify the legal consequences of that decision.
224.
For these reasons, the 2019 Declarations cannot retroactively invalidate or render inapplicable the offer to arbitrate that the Claimants accepted through their request for arbitration. That being said, it remains to be seen whether, by the time of the commencement of these proceedings, Article 8 of the BIT had been overridden as a consequence of Hungary's accession to the EU, pursuant to the conflict provisions of Article 30 of the VCLT.

c. Do the EU Treaties preclude the application of Article 8 of the BIT?

225.
In reliance on the conflict rules of Article 30 of the VCLT, the Respondent argues that Articles 267 and 344 of the TFEU override Article 8 of the BIT. The Claimants dispute the applicability of the conflict rules of Article 30 of the VCLT and submit that, even if they were applicable, the terms of the BIT would prevail.
226.

Article 30 of the VCLT sets forth rules to resolve conflicts between successive treaties that govern the same subject matter. In relevant part, it reads as follows:

Article 30 Application of successive treaties relating to the same subject matter

1. Subject to Article 103 of the Charter of the United Nations, the rights and obligations of States parties to successive treaties relating to the same subject-matter shall be determined in accordance with the following paragraphs.

2. When a treaty specifies that it is subject to, or that it is not to be considered as incompatible with, an earlier or later treaty, the provisions of that other treaty prevail.

3. When all the parties to the earlier treaty are parties also to the later treaty but the earlier treaty is not terminated or suspended in operation under article 59, the earlier treaty applies only to the extent that its provisions are compatible with those of the later treaty.

4. When the parties to the later treaty do not include all the parties to the earlier one:

(a) as between States parties to both treaties the same rule applies as in paragraph 3;

(b) as between a State party to both treaties and a State party to only one of the treaties, the treaty to which both States are parties governs their mutual rights and obligations.

227.
In order to determine whether the TFEU prevails over Article 8 of the BIT, the Tribunal must first answer two threshold questions: (i) do the BIT and the TFEU have the same subject matter as required by paragraph 1 of Article 30 of the VCLT and, if in the affirmative, (ii) is Article 8 of the BIT in conflict with Articles 267 and 344 of the TFEU?

(i) Same subject matter

228.
The Parties disagree on the interpretation of the same subject-matter requirement under Article 30(1) of the VCLT. According to most prominent commentators, the formulation should be understood widely.168 That being said, it cannot be reduced to a requirement that the two treaties be potentially applicable to the same set of circumstances. Such a reduction would render the requirement superfluous. Indeed, if two treaties do not apply to the same set of circumstances, they are not in conflict and Article 30 does not come into play.
229.

Therefore, to satisfy the same subject-matter requirement, it does not suffice that the successive treaties potentially govern the same facts. This was the conclusion in EURAM v. Slovak Republic for instance:

Even if two different rules deal with issues arising from the same facts, it does not necessarily mean that they have the same subject matter. This can be seen from a simple example: a treaty on environmental protection and a treaty on trade may both apply to the same factual situation but the subject matter with which they deal is quite different.169

230.

Investment treaty tribunals have understood that the subject-matter of a treaty is defined by the matters with which the treaty's constituent provisions deal. In the words of the Oostergetel tribunal:

The requirement […] that the two treaties relate to the "same subject matter" has to be construed in line with the dominant view expressed in scholarly writings to the effect that two treaties can be considered to relate to the "same subject matter" only if the overall objective of these treaties is identical and they share a degree of general comparability.170

231.
In respect of the EU Treaties, investment jurisprudence is consistent in holding that investment treaties do not share the subject matter with the EU Treaties. By contrast, the Achmea Decision is silent on whether the intra-EU investment treaties and the TFEU govern the same subject matter for the purposes of Article 30 of the VCLT.
232.

Among investment awards, the Wirtgen tribunal found it "obvious" that intra-EU investment treaties and the TFEU did not relate to the same subject matter,171 and noted:

To take but one example, Article 10 of the Treaty allows an investor to sue a host state. No parallel provision exists in the TFEU. […] Similarly, EU law does not provide a protection similar to the FET found in the BIT.172

233.
Earlier, the Eastern Sugar tribunal had observed that "the BIT […] provides for a special procedural protection in the form of arbitration between the investor state and the host state and, especially arbitration of a ‘mixed' or ‘diagonal' type between the investor and the host state". That tribunal thus emphasized that "[f]rom the point of view of the promotion and protection of investments, the arbitration clause is in practice the most essential provision of Bilateral Investment Treaties," and added that "EU law does not provide such a guarantee."173
236.
The Tribunal sees no reason to diverge from the consistent line of investment awards according to which the EU Treaties and investment treaties do not share the same subject matter. Consequently, the conflict rules embodied in Article 30 of the VCLT do not apply to possible conflicts between the BIT and the EU Treaties.
237.
The Parties have not pointed to, and the Tribunal is not aware of the existence of, provisions in the VCLT or of norms of customary international law that would govern the resolution of possible conflicts between successive treaties that do not share the same subject matter. Importantly, pursuant to Article 42(1) of the VCLT, "[t]he validity of a treaty or of the consent of a State to be bound by a treaty may be impeached only through the application of the present Convention."
238.
For these reasons, the conclusions that the BIT and the EU Treaties do not have the same subject matter and thus Article 30 of the VCLT does not apply dispose of the question whether the BIT's offer to arbitrate was valid and applicable at the commencement of this arbitration. The analysis could stop here. Yet, because the Parties have extensively briefed these issues, the Tribunal will review the existence of a conflict assuming same subject matter.

(ii) Conflict

239.
Even if it were considered that the BIT and the EU Treaties share the same subject matter, the BIT's consent to arbitrate would not be precluded by operation of the EU Treaties, since there is no conflict between Article 8 of the BIT and Articles 267 and 344 of the TFEU.
240.

When States subscribe to successive treaties, without thereby terminating or amending any of them, it should be presumed that they did not intend to create a normative contradiction. This presumption of non-conflict derives from the principle of harmonious interpretation of international law:

There is a general principle under international law whereby the interpreter tries to smooth out or even to avoid conflict by way of "harmonizing interpretation" (presumption of non-conflict). This rule is based on the assumption that when States wanted different rules to be applicable they could not at the same time have wanted normative contradiction.176

241.

As a leading commentary to the VCLT suggests, "[i]f apparently conflicting treaty provisions can be interpreted in such a way that they are compatible with each other, this approach is the first to be chosen."177 This harmonious interpretation should not be understood as a suggestion to ignore outright conflicts. An outright conflict "arises only where a Party to the two treaties cannot simultaneously comply with its obligations under both treaties,"178 or in different words:

Treaties are incompatible with each other if their obligations cannot be complied with simultaneously, ie if a State Party to both treaties cannot comply with one of them without breaching the other.179

242.

Bearing these explanations in mind, the Tribunal fails to see a conflict between Article 8 of the BIT and Articles 267 and 344 of the TFEU. Article 344 reads as follows:

Member States undertake not to submit a dispute concerning the interpretation or application of the Treaties to any method of settlement other than those provided for [in the Treaties].

243.
The language of this provision does not limit or prohibit the submission of disputes with investors based on an investment treaty to other adjudicatory bodies. Instead, it limits the power of the Member States to litigate (or arbitrate) disputes concerning the interpretation or application of the EU Treaties by means other than those provided in the EU Treaties.
244.
In line with this distinction, Article 8 of the BIT provides for international arbitration of disputes "arising under Article 6 [of the BIT]", not of "a dispute concerning the interpretation or application of the [EU] Treaties". It is true that a dispute arising under Article 6 of the BIT may involve, as preliminary or incidental issues, matters calling for the interpretation or application of the EU Treaties. At most, one might argue that Article 344 of the TFEU carves out from the subject-matter scope of Article 8 of the BIT potential investment disputes that also involve "interpretation or application of the [EU] Treaties". The Tribunal can leave this question open as the present dispute does not call for the interpretation or application of the EU Treaties. Therefore, at the time when the Claimants commenced these proceedings, the BIT's offer to arbitrate was valid in respect of the subject-matter scope of the present dispute.
245.

The next provision that the Respondent considers to be in conflict with Article 8 of the BIT is Article 267 of the TFEU, which reads as follows:

The Court of Justice of the European Union shall have jurisdiction to give preliminary rulings concerning:

(a) the interpretation of the Treaties;

(b) the validity and interpretation of acts of the institutions, bodies, offices or agencies of the Union.

246.
Here the potential for a normative conflict is even more remote. This provision confers the power to give preliminary rulings on the CJEU. It is unclear how this power conflicts with the submission of a dispute under a BIT to international arbitration. It is true that an investment treaty tribunal is not empowered to resort to the CJEU for a preliminary ruling. This alone does not give rise to a normative conflict with Article 267. Indeed, the language of Article 267 does not create an obligation for the Member States to ensure that each and every adjudicatory body potentially applying EU law may seek a preliminary ruling from the CJEU. Even at the level of the domestic courts of the EU Member States, there is no such obligation. In addition, if that were the meaning of Article 267, the Member States would violate Article 267 by allowing commercial arbitration as well as arbitration under extra-EU investment treaties, since arbitral tribunals constituted under these mechanisms may be called upon to apply EU law and have no standing to request preliminary rulings.
247.
In any event, as with Article 344, resorting to the principle of harmonious interpretation, Article 267 might at most be understood as a carve out – as opposed to a complete preclusion –- from the subject-matter scope of Article 8 of the BIT in respect of disputes that relate to the interpretation of the EU Treaties, or the validity and interpretation of acts of the EU institutions. Here again, the Tribunal leaves this issue open as the present dispute does not fall in that category.
248.
For these reasons, subject to the Respondent's objection to the subject-matter jurisdiction, which will be addressed next, the Tribunal concludes that at the time of the initiation of these proceedings the BIT's offer to arbitrate was standing and that a valid arbitration agreement was formed when the Claimants accepted this offer, thus creating the consent to arbitrate required under Article 25 of the ICSID Convention.

B. SUBJECT-MATTER JURISDICTION

249.
It is common ground that the Claimants' farming business in Hungary constitutes an investment within the meaning of the BIT and the ICSID Convention. The Parties disagree, however, on whether the consent to arbitrate "any legal dispute arising under Article 6 [the expropriation provision]" of the BIT extends to the present dispute and, in particular, whether Hungary's measures were capable of constituting an expropriation of the assets constituting an investment.

(1) The Respondent's Position

250.
The Respondent contends that the present dispute does not fall within the subject-matter scope of the BIT's dispute resolution provision, since none of the conduct alleged by the Claimants is capable of constituting an expropriation.
251.
First, although the Claimants' farming business in Hungary indisputably constitutes an investment,180 the farm as a whole is not the subject of the expropriation claim, since the Claimants continue to derive profit from it.
252.
Second, the Lease cannot be the subject of an expropriation either, because it expired on 25 July 2014 on its own terms.181 In this respect, the Respondent counters the Claimants' submission that a new lease was formed by virtue of their exercise of the alleged pre-lease right on 29 April 2014. At that time, so says the Respondent, the Claimants no longer possessed a contractual pre-lease right as it was extinguished by the 2006 Lease Amendment.
253.
In any event, as the Respondent's legal expert Professor Menyhárd explains, the exercise of a pre-lease right does not automatically result in the conclusion of a new lease. For that result to ensue two conditions must be met: (i) the lessee who purports to exercise the pre-lease right must demonstrate that he/she is capable of performing the lease under the terms offered by the relevant third party and (ii) no lease contract must yet be concluded with a bona fide third party.182 The Claimants' purported exercise of the pre-lease right on 29 April 2014 met none of these conditions. Thus, at most, Inícia only possessed a right to seek damages from the NLA for breach of contract.183
254.
Third, the alleged pre-lease right and right to claim damages for the conduct of the Tenders do not constitute an investment under the BIT and are thus not capable of being expropriated. In particular, pre-lease rights, being non-transferable184 and lacking intrinsic value, do not constitute "assets" within the meaning of the definition of investment contained in Article 1 of the BIT. In the proper context and in light of the object and purpose of the BIT, the term "asset" should be understood to denote proprietary rights. This understanding is confirmed by the arbitral jurisprudence185 and legal scholars.186
255.
According to Hungary, the Claimants' legal expert Professor Halmai errs when he declares that pre-lease rights are property rights under Hungarian law. The Respondent argues that under Hungarian constitutional law, "a pre-lease right does not belong to the core of the content of a lease contract: it does not provide the right to acquire a lease."187 Thus, as Professor Menyhárd opines, even if a lease were to enjoy constitutional protection as property under certain circumstances, it does not automatically follow that such protection extends to pre-lease rights.188
256.
In addition, continues the Respondent, the notice for the Tenders expressly stated that "no pre-lease right can be exercised in connection with the tender."189 By taking part in the Tenders, the Claimants accepted these terms. As the Constitutional Court held in a case involving strikingly similar circumstances, a lease holder's participation in the tender under such terms undermines his alleged "entitlement to property" with respect to the land.190
257.
The Respondent further submits that the alleged right to damages arising out of the Tenders does not constitute an asset qualifying as an investment and being susceptible of being expropriated. An unadjudicated claim, even if founded, has no ascertained monetary value and is not transferable. Therefore it does not constitute assets.191 In Emmis v. Hungary, the ICSID tribunal determined that "[i]t is the asset itself – the property interest or chose in action – and not its contractual source that is the subject of the expropriation claim."192 In any event, the measures complained of are not an expropriation of a damages claim that may result from the Claimants' loss of the Land following the Tenders. Indeed, the Claimants do not allege that Hungary passed legislation preventing them from pursuing their claim for damages. These alleged claims are not therefore in dispute and cannot serve as the basis for the Tribunal's jurisdiction.
258.
Finally, the Respondent argues that the alleged pre-lease rights and the claims arising under the Tenders do not qualify as investments within the meaning of the ICSID Convention, as they do not bear the hallmarks of an investment.193 They do not involve (i) a commitment of resources, (ii) over a certain duration, (iii) involving a risk and (iv) making a contribution to the host State's economic development. The Claimants' position that the term "investment" has no independent meaning under Article 25 of the ICSID Convention is untenable as demonstrated by a wealth of ICSID awards.
259.
For these reasons, the Respondent maintains that the Tribunal does not have jurisdiction over the subject matter of the present dispute.

(2) The Claimants' Position

260.
The Claimants assert that the investment for present purposes is constituted of the leasehold rights over the Land, which "comprise a lease (created as a result of the exercise of the contractual pre-lease right on 29 April 2014), a contractual pre-lease right, a statutory pre-lease right and a right to damages arising from the manipulated tender scoring".194
261.
First, the Claimants counter the Respondent's argument that the Lease expired on its own terms. According to the Claimants, a new lease was created in April 2014, when Inícia exercised the contractual pre-lease right.195 The NLA's conclusion of a competing lease with the winners of the Tenders, who were acting in good faith, does not alter the fact that under the rules governing the pre-emption and pre-lease rights, Inícia's exercise of the pre-lease right resulted in a new lease. In such case, as Professor Menyhárd himself explains in his scholarly writings, "the contracts concluded one after the other represent equal ranking obligations."196 If the obligor chooses to perform one of the conflicting contracts to the detriment of the other, it owes damages to the creditor of the latter contract, being understood that both contracts are valid and enforceable. The Respondent's position that Inícia's exercise of the pre-lease right did not result in the creation of a new lease because of the NLA's choice to lease the Land to others is therefore unsupported by the applicable rules.197
262.
Second, the Claimants argue that the definition of "investment" agreed between the parties in the BIT governs as lex specialis. This definition, according to the Claimants, "is both the starting and the end point for the Tribunal's determination of what constitutes an 'investment' for the purposes of these proceedings."198 The ICSID Convention is deliberately silent on the definition of investment, so that the BIT parties could give their own definition.
263.
In any event, the Salini criteria to which the Respondent refers should not be regarded as jurisdictional requirements but merely as typical characteristics of investments under the ICSID Convention.
264.
Third, for the Claimants, their leasehold rights fall within the definition of investment in the BIT. In particular, the ordinary meaning of the word "asset" used in Article 1 of the BIT is not limited to rights in rem. ICSID tribunals and scholars widely opine that in personam rights can also qualify as investments under categories such as "claims to money and other assets or to any performance under contract having a financial value",199 and thus be expropriated.200 Indeed, the Claimants' right to use and collect the proceeds of the Land pursuant to the Lease, as it arises from the Hungarian Civil Code,201 is a claim under a contract having financial value.
265.
In any event, as Professor Halmai observes, the Claimants' leasehold rights are in rem rights that attract protection against expropriation under the functional approach to property adopted by Hungarian constitutional law.202 The Constitutional Court has indeed held that "the lessee's interest in the certain and durable existence of the lease may qualify as a property right under constitutional protection of property."203 According to the Claimants, it is precisely the constitutional law notion of property, as opposed to the more restrictive civil law definition, that is relevant in the present case, since the function of constitutional law in the municipal legal system is identical to that of international investment law.204 For example, as a matter of civil law, licenses or other public law rights could not qualify as property, even though they fulfil the traditional requirements of property. This approach is shared by investment tribunals, which have held that "the notion of property or assets is not to be narrowly circumscribed" and rights that are not traditionally regarded as in rem rights should also be "protected from expropriation".205
266.
According to the Claimants, their leasehold rights have the functional characteristics of property. First and foremost, they incorporate a right to possession, which is a fundamental component of property opposable to the public as a whole, including the lessor himself.206 In addition, a lease is transferable, albeit by consent of the lessor.207 It does not terminate upon the death of the lessee and passes to the heirs.208 Nor is the lease terminated by a change of lessor.209 In any event, if the Respondent insists on a narrow category of in rem rights, then the Claimants contend that the right to possess the Land that derives from the Lease and the leasehold rights, is the subject of the expropriation claim.210
267.
As for the pre-lease rights, the Civil Law Chamber of the Supreme Court211 as well as Hungarian scholars consider that a "pre-emption right based on statute necessarily has an in rem effect, because, as a result of its very nature, it obliges the owner or right holder of the asset at issue at all time."212 Both the Lease and the pre-lease right contained within the Lease are thus investments capable of expropriation.
268.
Fourth, the Claimants oppose the Respondent's reliance on the Constitutional Court ruling No. 3129/2018. In that case, the applicant leaseholder challenged the results of a tender by which it had lost the leased land. The Constitutional Court dismissed the application on the grounds that (i) the previous lease which was for a limited term had expired, (ii) that lease could not have been transformed into a lease for an indefinite term, and (iii) the applicant had no pre-lease right.213 If anything, this reasoning implies that, had there been a pre-lease right, the applicant would have held a constitutionally protected property right.214 It is thus unsurprising that the Respondent's own expert does not rely on this decision.
269.
Fifth, the Claimants assert that the pre-lease right is a transferable right that has an intrinsic financial value. In particular, under the Civil Code, a pre-lease right can be transferred by appointment of a third party to exercise the right. Such appointment differs from an assignment, which, as the Respondent points out, is null and void.215 An appointment does not require the owner's consent, and often third parties are prepared to pay for the appointment allowing them to exercise the pre-emption or pre-lease rights.216 In addition, a pre-lease right passes on to the legal successors of its holder together with the lease.
270.
Finally, the Claimants' loss of the Land as a result of the manipulated tender scores is actionable under Hungarian law in the form of a damages claim, i.e., a chose-in-action, which is a form of intangible property.217 This claim is a further right that can be expropriated.

(3) Analysis

271.

The scope of the Tribunal's jurisdiction is set out in Articles 25 of the ICSID Convention and 8.1 of the BIT, which read as follows:

Article 25

The jurisdiction of the Centre shall extend to any legal dispute arising directly out of an investment, between a Contracting State (or any constituent subdivision or agency of a Contracting State designated to the Centre by that State) and a national of another Contracting State, which the parties to the dispute consent in writing to submit to the Centre.

[…]

Article 8.1

Each Contracting Party hereby consents to submit to the International Centre for the Settlement of Investment Disputes (hereinafter referred to as "the Centre") for the settlement by conciliation or arbitration under the Convention on the Settlement of Investment Disputes between States and Nationals of other States opened for signature at Washington on 18 March 1965 any legal dispute arising under Article 6 [expropriation provision] of this Agreement between that Contracting Party and an investor of the other Contracting Party concerning an investment of the latter in the territory of the former.218

272.

Three jurisdictional requirements related to the subject matter of the dispute derive from these provisions:

• The dispute must arise directly out of an investment (Article 25 of the ICSID Convention);

• The dispute must "concern the investment" (Article 8.1 of the BIT);

• The dispute must arise under Article 6, which is the expropriation provision of the BIT (Article 8.1 of the BIT).

273.
The first two requirements appear met. The Parties do not dispute that the Claimants' farm is an investment within the meaning of both the ICSID Convention and the BIT. The present dispute, which concerns the alleged expropriation of the Claimants' leasehold rights, does arise out of that overall investment of the Claimants.
274.

It is well established in the investment treaty jurisprudence that, for purposes of subject-matter jurisdiction, the existence of an investment must be assessed holistically. So, for instance, in the words of the Holiday Inns v. Morocco tribunal:

[I]nvestment is accomplished by a number of juridical acts of all sorts. It would not be consonant either with economic reality or with the intention of the parties to consider each of these acts in complete isolation from the others.219

275.
Similarly, in Inmaris v. Ukraine, the tribunal held that "[f]or purposes of this Tribunal's jurisdiction […] the Tribunal need only determine the existence of a covered investment in the transaction as a whole."220 In addition, in CSOB v. Slovak Republic, the tribunal found that a dispute related to a loan agreement fell within its jurisdiction, since the loan was part of a broader consolidation transaction, which qualified as an investment.221 Had the tribunal singled out the loan agreement, it would likely not have deemed it an investment and would have declined jurisdiction.
276.
In other words, the Tribunal should look at the investment as a whole and ascertain whether the dispute has a sufficiently direct link with the overall investment. This is clearly the case here, where the dispute arises directly out of the activities of the Farm.
277.
As for the third requirement, Article 8 of the BIT requires that there be "a legal dispute arising under Article 6". According to the definition given by the PCIJ in Mavrommatis, under international law "[a] dispute is a disagreement on a point of law or fact, a conflict of legal views or of interests between two persons."222 The ICJ also defines a legal dispute broadly as "a situation in which the two sides hold clearly opposite views concerning the question of the performance or non-performance of certain treaty obligations."223
278.
Hence, for the Tribunal to have subject-matter jurisdiction under Article 8 of the BIT, it must be satisfied that the Parties are in "disagreement on a point of law or fact" concerning Hungary's performance or non-performance under Article 6 of the BIT. When assessing this requirement, it is not necessary for the Tribunal to establish whether the Claimants' assets have actually been expropriated. It is in the nature of a dispute that it may eventually be decided against the Claimants.
279.
Hungary argues that, by the time of the alleged measures, the Claimants no longer held any leasehold rights capable of being expropriated. The Claimants object that they had leasehold rights, which were in fact expropriated by the Respondent's measures, including the 2011 Amendment. For the purposes of its jurisdictional inquiry, the Tribunal need not go further. This disagreement is precisely a "legal dispute arising under Article 6" over which the Parties conferred jurisdiction to this Tribunal. In other words, the jurisdictional requirement is fulfilled and the Tribunal must decide this dispute on the merits.
280.
The Tribunal recognizes that its jurisdiction pursuant to Article 8 is restricted to reviewing whether there is a breach of Article 6 of the BIT. The Tribunal will not inquire into breaches of other rules of the BIT or international law. In other words, the effect of the subject-matter limitation of Article 8 of the BIT is that the Tribunal will scrutinize the Respondent's measures through narrow lenses that limit its vision to alleged violations of Article 6. In doing so, the Tribunal gives effective meaning to the subject-matter limitation of Article 8 of the BIT.
281.
In conclusion, the disagreement on whether the Claimants held rights capable of being expropriated and whether Hungary's measures were expropriatory constitutes "a legal dispute arising under Article 6" of the BIT. It thus falls within the Tribunal's jurisdiction pursuant to Article 8 of the BIT.

V. LIABILITY

282.
The Parties dispute whether the Respondent's conduct constituted an expropriation of the Claimants' investment. It is the Claimants' position that Hungary acting through the NLA expropriated Inícia's leasehold rights. By contrast, the Respondent submits that the actions of the NLA were not sovereign acts but were contractual in nature, and therefore not treaty violations. It further opposes the expropriation claim on the ground that Inícia did not hold rights capable of being expropriated, and that Hungary's conduct was in any event an exercise of regulatory police powers that is not compensable under international law.

A. THE CLAIMANTS' POSITION

283.
The Claimants submit that Hungary's measures were sovereign acts attributable to Hungary (1), which resulted in an expropriation of the Claimants' leasehold rights, including the contractual and statutory pre-lease rights as well as the new 20-year lease that was concluded upon Inícia's exercise of the pre-lease right in April 2014 (2). They object to the Respondent's police powers defense and argue that Hungary's measures were arbitrary and discriminatory, as they were motivated by political favoritism and thinly veiled xenophobia (3).

(1) Hungary exercised sovereign powers

284.
The Claimants first point out that one of the key acts which they challenge and which resulted in the expropriation of the statutory pre-lease right was the 2011 Amendment, which is a legislative Act passed by Parliament. As such, it indisputably constitutes sovereign conduct attributable to Hungary.
285.
Similarly, the Claimants' physical eviction from the Land was carried out with direct participation of the State. The contract that the NLA signed with the private security guards shows that the NLA was contracting as a representative of the State.224 Dr. Bitay, State Secretary at the Ministry of Agriculture, confirmed in his witness statement that he personally arranged the physical eviction of the Claimants as the representative of the State.225 By this admission, the State has embraced the NLA's conduct as its own, pursuant to Article 11 of the ILC Articles on State Responsibility (the "ILC Articles").
286.

In addition, as Section 3 of the NLA Act shows, the NLA is nothing but an instrumentality of the Hungarian Minister of Agriculture:

The minister in charge of the agricultural sector (hereinafter referred to as "minister") shall exercise ownership rights and discharge obligations in connection with the National Land Fund in the name and on behalf of the Hungarian State through the [NLA].226

287.
The NLA is set up as a so-called "central budgetary organ", as opposed to a corporation, foundation, association or other civil or corporate law entity.227 Its officials are public servants who are under a duty to make public disclosure about their finances, which are reviewed by the State audit office.228
288.
In addition, Hungary exercises close control over the NLA, which includes the right to issue the Deed of Foundation and the bylaws of the NLA; to approve the bylaws of the Council of the NLA; to appoint the Chairman and, upon the motion of the latter, the Deputy Chairmen of the NLA; to appoint the Chairman and the Members of the NLA Council; to approve the NLA's yearly plan and to submit to the government for approval the NLA's mid-term strategic plan relating to the use and exploitation of the assets of the NLA; and to decide upon the financial appropriations relating to the budget of the NLA. According to the Claimants, there is thus no doubt that the NLA's conduct is attributable to Hungary.
289.
In addition, the Claimants contend that the management of State land is not a commercial activity and that the Respondent itself admits it when arguing that the NLA's conduct was in line with the State's social policy in the field of agriculture.229 Hungary cannot have it both ways. If it intends to defend the NLA's conduct on the basis that it formed part of the implementation of the Respondent's social policies, it cannot at the same time, so say the Claimants, argue that the NLA merely engages in the commercial management of State land. When the NLA defines the tender rules in order to implement the State landholding policies, it exercises public authority and fulfils a public function.230
290.
Therefore, in the Claimants' submission, the cancellation of Inícia's statutory pre-lease right, the manipulation of the tender scores, the failure to publish or communicate the winning bids to the Claimants, the purported transfer of possession of the Land in October 2014, and the physical eviction of the Claimants from the Land in July 2015 using private armed security guards are far from being simple contractual breaches as they involve the exercise of sovereign powers.231

(2) Hungary expropriated the contractual pre-lease right

291.
The Claimants argue that the Respondent's conduct amounted to expropriation of their leasehold rights, including the contractual and statutory pre-lease rights and the renewed 20-year lease which they obtained in July 2014, as well as the statutory pre-lease right, which the 2011 Amendment rendered nugatory.
292.
In respect of the contractual pre-lease right, the Claimants request the Tribunal to discard the Metropolitan Court's decision of 7 December 2017, which erroneously held that the 2006 Lease Amendment granted no contractual pre-lease right to Inícia.
293.
According to the Claimants, the Metropolitan Court's judgment contradicted the practice of other lower courts holding that the standard language of Section 5.1 of the 2006 Lease Amendment did grant contractual pre-lease rights. Panel V of the Curia, Hungary's highest court, had sustained this interpretation in the so called Gyula case.232 This is the same panel that remanded Inícia's case to the Metropolitan Court for lack of sufficient reasons. The Metropolitan Court chose to rely on the interpretation given by another panel of the Curia, Panel VI, and to declare that Section 5.1 of the Lease (as amended by the 2006 Lease Amendment) did not provide a contractual pre-lease right. In doing so, the Metropolitan Court failed to address several crucial arguments of Inícia.
294.
In particular, the Metropolitan Court did not apply the rule contra proferentem set out in Section 207(2) of the Civil Code. The NLA drafted the disputed pre-lease provision of the 2006 Lease Amendment, which it used as a standard term for numerous leases of State-owned land. Thus, under the principle contra proferentem, any ambiguity in the pre-lease provision had to be interpreted against the NLA. The very fact that different courts reached different outcomes when interpreting the pre-lease provision proves the ambiguity. In addition, the provision meets all the criteria for the application of Section 207(2) of the Civil Code as (i) it was defined unilaterally by the NLA as a standard term; (ii) the NLA used the same term for more than one lease agreement with different lessees; and (iii) Inícia has not participated in an individual negotiation of the pre-lease provision.
295.
In respect of the last element, the Claimants clarify that, although Inícia had an opportunity to familiarize itself with the terms of the draft 2006 Lease Amendment, this does not mean that the relevant contractual provisions were not standard terms for the purposes of the contra proferentem rule. The requirement that the other party have an opportunity to familiarize itself with the standard term is a condition for the standard term to become part of the parties' agreement (Section 205.B.1 of the Civil Code). It says nothing about whether the term in question is a standard term (Section 205.A.1). A term is standard when it was drafted by one party and not negotiated. This is the test for the application of the contra proferentem rule.
296.
In addition, according to the Claimants, if the Respondent is right that the 2006 wording of the pre-lease provision removed the contractual pre-lease right that existed in the 1999 version of the Lease, then this removal must be regarded as a surprise term. According to Section 205.B.2 of the Civil Code, surprise terms do not become part of the contract, unless they have been specifically notified. The Claimants received no such notification. Therefore, the removal of the contractual pre-lease right, if this indeed was the effect of Section 5.1 of the 2006 Lease Amendment, meant that the change never became part of the agreement, and that the previous version of the contract that included the contractual pre- lease right continued to apply.
297.
Therefore, the Claimants validly exercised their contractual pre-lease right by a notice of 29 April 2014, resulting in the conclusion of a new lease agreement. The Respondent refused to give effect to the valid exercise of the Claimants' rights and eventually physically evicted the Claimants from the Land. These actions constitute an expropriation of the Claimants' contractual pre-lease right and of the new lease that was entered into as a result of the valid exercise of that right.

(3) Hungary expropriated the statutory pre-lease right

298.
In any event, the Claimants argue that, even if they had no contractual pre-lease right, the Respondent expropriated their statutory pre-lease right by passing the 2011 Amendment, which prohibited its exercise in the context of NLA tenders. According to the Claimants, the pre-lease right that the legislation conferred on lessees of agricultural land was a vested right, guaranteeing legal certainty in order to induce investment. According to Professor Halmai, the 2011 Amendment was unconstitutional as it "deprived lessees of their acquired right to renew their leases without appropriate transitory rules or compensation".233
299.
The Claimants oppose Professor Menyhárd's interpretation of the Constitutional Court Decision in Case No. 16/2015, where the court held that the 2011 Amendment did not violate the principle of freedom of contract under the Constitution. According to the Claimants, this ruling determined that the 2011 Amendment was not a violation of the right to property, although this issue was not put to the court.234 The only two judges on the court appointed before Fidesz's return to power issued a joint dissent. They held that the statutory pre-lease rights had been acquired "at the time of the execution of the lease contracts" and that they "had a concrete, quantifiable value", with the result that "depriving the lessees from this right, as an already acquired right, without compensation violates the principle of legal certainty, which is the theoretical basis of the protection of acquired rights".235

(4) Hungary's measures were not a lawful exercise of police powers

300.
The Claimants dispute the Respondent's police powers defense. According to them, the doctrine of police powers applies in a limited set of circumstances and only in the context of regulatory expropriation, which is a form of indirect expropriation. Here, the Respondent directly expropriated the Claimants' rights, both by removing the leasehold rights and by physically seizing the Land. Thus, the doctrine of police powers is of no avail to Hungary.
301.
In addition, so say the Claimants, Hungary's measures served none of the grounds justifying the exercise of police powers, as they were not taken to protect public order and morality, human health or the environment. Even if they did, it would not absolve Hungary from the obligation to pay compensation for the expropriation. As the tribunal in Pope & Talbot v. Canada observed, "a blanket exception for regulatory measures would create a gaping loophole in international protections against expropriation."
302.
In any event, for the Claimants, the Respondent cannot validly invoke the police powers defense since it expropriated the Claimants' leasehold rights in an arbitrary and discriminatory manner. In particular, the 2011 Amendment nullified the pre-lease rights only in respect of tenders of State-owned land and not private land. If the government really aimed at promoting local and family farms, the policy should have applied to the leases of private land as well. The reason why the Government rid itself of existing acquired rights of incumbent lessees of State-owned land was political favoritism, a phenomenon which the Claimants describe by reference to a book published by Professor Jószef Ángyán, who resigned from the government in protest in 2012. Professor Ángyán writes about what he calls the post-soviet mafia State set up by the Fidesz government. Among other examples, Professor Ángyán mentions that the sister-in-law of the Prime Minister's daughter won each of the tenders in which she bid because she was conveniently awarded much higher "subjective points" than other bidders for her business plan despite her low "objective points", or that the Prime Minister's childhood friend, Mr. Lőrinc Mészáros, a former gas fitter and now Hungary's second richest man, owned no land in 2010 and now owns or leases over 36,000 hectares of agricultural land through family members and related companies.236
303.
According to the Claimants, contrary to Hungary's rhetoric that the land reform aimed at making the land available to local family farmers, only a minority of leases were in fact awarded to locals. The Respondent's reliance on the fact that the average surface area of the leases was 24.81 hectares is misleading. Behind this average there is an extremely unequal distribution where the top 1.9% of the winners were awarded 24-25% of the land and the top 0.4% of winners obtained 11% of the land. In addition, a significant portion of the State-owned land was leased to favored individuals without a tender.237
304.
The Claimants suggest that the Fidesz government deliberately acted with the covert agenda of political favoritism. When the Parliament passed the 2011 Amendment, the opposition harshly criticized the almost unfettered discretion that the NLA was accorded in distributing State-owned land by using the subjective scoring element for the "professional and commercial well-foundedness of the business plan".238 Tellingly, the Claimants lost the Tenders precisely due to their low scores in this entirely subjective component of the scoring system.
305.
By contrast, the owner of a sister farm similar to that of the Claimants, Mr. Lorant Szasko, who is a founding member of the Fidesz party, won all 25 tenders that the NLA announced on his land. Were it not for the high subjective scores he received for his business plan, he would have lost 22 out of the 25 tenders.
306.
Dismayed with the public scrutiny, on 25 May 2013, Hungary amended the NLA Decree whereby, after awarding a lease, the NLA returned every bid to the bidders, with the exception of the winning bid, thereby rendering it impossible to make any comparison of the scoring of the bids.239 The Respondent also eliminated the requirement to aggregate the landholdings of family members and related companies when calculating an individual's compliance with the legal maximum landholding, paving the way for the favored families to appropriate large tracts of land.
307.
In this respect, the Claimants allege that they "are aware, from their local knowledge, that several of the 'winners' of their tenders use and/or own large tracts of agricultural land through their families and related companies."240 In the document production phase, the Tribunal ordered the Respondent to produce extracts from the Land Use Register and the Land Registry showing the total agricultural land used and/or owned by these winners and their families and companies. However, the Respondent failed to comply. According to the Claimants, "[t]he inference to be drawn is obvious".241
308.
Furthermore, it is the Claimants' submission that the government officials implementing Hungary's land policies did not veil their xenophobic motives, making statements such as: "we will protect Hungarian agricultural lands"242 and "ensure that farmland, be it leased or owned, remains with Hungarian people";243 "whoever owns the land owns the country";244 and referring to "the battle against foreign penetration".245
309.
Nor were the Claimants afforded due process in the course of the expropriation. Besides being denied the opportunity to consult crucial tender documentation until ordered by this Tribunal, the Respondent handled the Claimants' physical eviction from the Land in disregard of its own laws, without giving a fair notice and using private security guards hired by the NLA, all despite the possessory protection orders that the Claimants had obtained from the local courts.

B. THE RESPONDENT'S POSITION

310.
The Respondent opposes the expropriation claim. It submits that one category of the impugned measures – the alleged improper conduct of the Tenders – has no bearing on the expropriation claim as the Claimants had no vested right that was at stake at the time of the Tenders (1). For the Respondent, the expropriation claim also fails in respect of the alleged pre-lease rights, since the contractual pre-lease rights ceased to exist as a result of the 2006 Lease Amendment (2) and the statutory pre-lease rights conferred no vested right subject to expropriation (3). In any event, the Respondent argues that the 2011 Amendment was a lawful exercise of police powers that is not compensable under international law (4).

(1) The Tenders are irrelevant to the expropriation claim

311.
The Respondent points out that the manner in which the NLA conducted the Tenders has no connection with the alleged expropriation, since the Claimants cannot seek damages for the expropriation of a lease that Inícia did not hold. The Lease expired in July 2014 and Inícia's participation in the Tenders could thus not lead to the renewal of the Lease, but only to the conclusion of a new lease, which admittedly did not happen. At the time of the alleged "manipulation" of the Tenders, the Claimants neither held a lease; nor could they claim an unconditional right to win the Tenders. Hence, according to the Respondent, even assuming that the Tenders were biased to ensure that the Claimants lost, they could not give rise to an expropriation claim.
312.

In any event, the Respondent rejects the Claimants' allegation that the Tenders were manipulated. It argues that the circumstances on which the Claimants rely are either unsupported by evidence or irrelevant. Specifically, it makes the following submissions:

• The NLA did not communicate the winning bids to Inícia because Inícia had no legal right to receive full details of such bids. Inícia would only have been entitled to communication if it had an exercisable pre-lease right, which it did not. As for other tender documents, such as scoring sheets, Inícia and the NLA were engaged in domestic litigation on Inícia's right to access to that information. However, as a sign of good faith, the Respondent promptly complied with the Tribunal's order to produce the relevant documents in this arbitration.246

• The Claimants' contention that they lost 15 out of the 16 Tenders on account of artificially low scores received for its business plan is demonstrably false. Even absent this component, which is worth 30 points out of a possible 105, Inícia would have failed in at least eight tenders. The scoring sheets reveal that in three instances, the winners prevailed against Inícia on all the other scores too.247 In five further instances, Inícia's bids were simply disqualified as they did not attach all the required documentation.248

• The Claimants purport to compare their farm with the farm of Mr. Szajko, who won the tenders in respect of the land which his farm was leasing. They suggest that Mr. Szajko's farm was "similar" to theirs in "almost every respect".249 There is, however, no evidence to support this assertion. In any event, the fact that Mr. Szajko won an unrelated tender says nothing about whether the Claimants lost the Tenders in an unfair manner.

• Similarly, the Claimants do not substantiate their allegation that the winners of the Tenders and their families hold large tracts of land. Even if Mr. Hunter's assertion that the winners lease hundreds or in some cases one thousand hectares of land were true, this would not exceed the permitted maximum landholding limit, which is 1,800 hectares.250

313.
Therefore, the Respondent requests the Tribunal to dismiss the Claimants' submission concerning the conduct of the Tenders, as such conduct cannot constitute an expropriation and the claim is in any event unsupported by evidence.

(2) Hungary did not expropriate the contractual pre-lease right

314.
The Respondent submits that the Claimants had no contractual pre-lease right under the 2006 Lease Amendment and that, even if they had, the NLA's denial of the exercise of that right would constitute a breach of contract, not a violation of international law.
315.

According to Hungary, while the 2006 Lease Amendment allowed Inícia to extend the Lease for 10 years, it envisaged that Inícia would give up the contractual pre-lease right that had figured in earlier versions of the Lease. In particular, it removed the language – "[i]n respect of these plots of land the lessor grants a pre-lease right to the current tenant" – present in Section 3.2 of the 1999 Lease Agreement251 and substituted it with Section 5.1 of the 2006 Lease Amendment, which reads as follows:

With regard to the plots of land subject to the lease, the Tenant enjoys a pre-emption right and a pre-lease right that may be exercised in accordance with the applicable laws effective at all times, and which may not be registered in the Land Registry.252

316.
In 2017, the Metropolitan Court – a court with exclusive jurisdiction over disputes arising under the 2006 Amendment253 – ruled unequivocally, so says the Respondent, that this language did not confer a contractual pre-lease right to Inícia.254 As a consequence, only circumstances akin to denial of justice could empower the Tribunal to reopen this ruling. The Claimants do not allege such circumstances, but instead re-argue their case before this Tribunal on the ground that the Metropolitan Court's judgment is "not persuasive".255 A treaty tribunal cannot assume a mandate of a global court of appeal, purporting to correct the local courts' interpretations of municipal law.
317.
For the Respondent, the Claimants' unsupported contention that Inícia had filed a request for extraordinary review of the judgment of the Metropolitan Court to the Curia does not alter this analysis. As a matter of Hungarian law, a judgment of the Metropolitan Court is not subject to appeal.256 While it can be subject to annulment, the annulment proceedings do not stay enforcement of the Metropolitan Court's judgment. As a result, the judgment must be deemed to carry res judicata effects.257
318.
In any event, so argues the Respondent, the Metropolitan Court's interpretation of Section 5.1 of the 2006 Lease Amendment is fully tenable. The Claimants' contrary arguments based on the rules contra proferentem and against surprise terms do not withstand scrutiny. Hungary does not contest that these provisions apply to standard contracts. However, as the opinion PK 2/2011 of the Curia holds, a contract is not a standard contract "if the consumer had a real opportunity to modify the contract term, meaning the party establishing the contract term in advance has actually made it possible for him to consider its content and to enforce his will in this regard."258
319.
According to the Respondent, it is undisputed that Inícia received a draft 2006 Lease Amendment in advance of the signature. Yet, it did not use this opportunity to seek changes to the contract, unlike other lessees who concluded their leases contemporaneously. For instance, the lessee involved in the Gyula litigation succeeded in including the clause providing for the pre-lease right into the amended lease contract.259 Consequently, the terms of the 2006 Lease Amendments were open to negotiation. The Claimants' reliance on the result of the Gyula litigation is misplaced.
320.
In any event, the invocation of the rule contra proferentem is inapposite for yet another reason. According to the Respondent, this rule applies when contractual terms are ambiguous. Section 5.1 of the 2006 Lease Amendment clearly refers to a pre-lease right that "may be exercised in accordance with the applicable laws effective at all times". These words unambiguously refer to the statutory pre-lease right. The fact that the Parties diverge on the interpretation of the provision is not sufficient to conclude that a provision is ambiguous.
321.
Similarly, in respect of the rule on surprise terms embodied in the Civil Code, the Respondent contends that, even if Section 5.1 were to be regarded as a surprise term, the only consequence would be that it would be unenforceable. It would not mean that the pre-lease provision of the 1999 Lease Agreement would be reinstated. And, even if Section 3.2 of the 1999 Lease Agreement were reinstated, that lease and any pre-lease right it established would in any event have expired in 2009, i.e. well before Inícia purported to exercise the pre-lease right in 2014.
322.
For these reasons, the Respondent requests the Tribunal to reject the Claimants' attempt to re-litigate issues of national law which the Hungarian courts with exclusive jurisdiction have already resolved.
323.
Finally, Hungary argues that even if the Tribunal were to find that Inícia was entitled to the contractual pre-lease right, the NLA's refusal to comply with this right would constitute no more than a contractual breach. Hungary has not passed any legislative or administrative measures prohibiting the exercise of a contractual pre-lease right. The Claimants' argument that the NLA had the status and function of a State organ is misconceived. Status and function of a given body can be relied upon to determine whether an entity is an emanation of a State and whether its acts are attributable to the State. However, they cannot establish whether the acts complained of in a particular instance were committed in the exercise of sovereign power. Numerous treaty tribunals have clearly stated that a simple denial of a contractual right by a State party amounts to a breach of contract, as opposed to an internationally wrongful act.260
324.
The NLA's denial of Inícia's alleged contractual pre-lease right arose in the course of ordinary business between a landlord and a tenant. The same observation applies to the alleged "'attempt to take back possession of the land on 25 July 2014,' the purported 'transfer of possession of the land in October 2014' and the 'physical eviction […] using private armed security guards.'"261 Here too, the NLA acted as an ordinary landlord without resorting to government prerogatives. Its conduct is therefore not subject to scrutiny under the BIT.

(3) Hungary did not expropriate the statutory pre-lease right

325.
The Respondent further counters the Claimants' allegation that it expropriated Inícia's statutory pre-lease right. It submits that the statutory pre-lease right is not a vested right under international or Hungarian law. Instead, it is a right conferred by general legislation which can change based on policy considerations and bear circumstances. In this context, it is undisputed that the Claimants never received any assurances that the legislation would remain unchanged.
326.
The Respondent refers to decisions of investment treaty tribunals, according to which, in the absence of specific assurances, the State retains the power to change its laws.262 The distinction that the Claimants draw arguing that the present case is a direct not an indirect expropriation is unavailing. The 2011 Amendment did not directly remove the statutory pre-lease right; it only limited the exercise of that right in connection with the tenders organized by the NLA. Thus, it was not a measure of direct expropriation.
327.
The Constitutional Court of Hungary confirmed that the statutory pre-lease right is not a vested right. It held that statutory pre-lease right holders must consider "that the law may change."263 The Claimants and their legal expert Professor Halmai purport to rebut this settled law by reference to the principles of "legal certainty" and "lawful expectations" arguing that "the 2011 Amendment was unfair and unjustified (and therefore unconstitutional)."264 This does little to show that Hungary's measures were expropriatory. The Contracting States to the BIT limited the Tribunal's mandate to deciding disputes exclusively in respect of expropriatory conduct, and the Tribunal ought to respect this undisputed limitation.

(4) Hungary exercised police powers

328.
The Respondent contends that the 2011 Amendment was a regulatory measure carried out within the bounds of its police powers. It opposes the Claimants' argument that the doctrine of police powers applies only to indirect expropriations on two grounds. First, numerous tribunals have referred to the police powers doctrine when assessing the existence of a direct expropriation.265 Second, the 2011 Amendment was not a direct expropriation as it did not remove or invalidate Inícia's statutory pre-lease right. It merely restricted its exercise in the context of NLA tenders. The defense of police powers is therefore available to the Respondent.
329.
The Respondent strongly denies the Claimants' allegations that Hungary's organs, including the government and the legislature, had ulterior motives of political favoritism and xenophobia with respect to the land reform. When implementing the land reform, Hungary states that it acted in pursuit of the common welfare objective of "promoting the establishment of viable family farms".266 As the primary means to implement its newly defined landholding policies, Hungary introduced a tender procedure in 2010. The system of statutory pre-lease rights was incompatible with the tender system because it prevented the redistribution of the State-owned land on the basis of the criteria established for the tender. This incompatibility was admitted by Professor Ángyán, the former politician on whose politically-biased 2014 report the Claimants rely.267 The 2011 Amendment, which proscribed the exercise of statutory pre-lease rights in the context of the NLA tenders, evidently aimed at implementing Hungary's general welfare objectives.
330.
In addition, the Parliament passed the 2011 Amendment in accordance with standard legislative procedures, involving multiple rounds of consultation and the implementation of many of the opposition's comments. As a result, the opposition supported the bill.268
331.
For the Respondent, the Claimants' contentions of manipulation of the Tenders are also unfounded. The report of the Supervisory Committee of the NLA, which the Claimants invoke, concluded that the tender evaluation system was in line with Hungarian law and landholding policy.269
332.
Professor Ángyán's bold statement that the tenders did not achieve the stated public policy objectives does not help the Claimants' case either. While the land reform may not have been as successful as the government had hoped, it still achieved important results. In particular, the number of tenants rose drastically from 600 in 2010 to 7500 in 2015. Nearly 85% of these new tenants were natural persons, and 21% of them were under the age of 40. The average size of the land awarded by tender was 24.81 hectares.270
333.
As to the 16 Tenders in which Inícia participated, Inícia's low scores for the subjective business plan element did not determine the outcome. In line with the policy objectives of the land reform, the Land was awarded to 16 farmers all of whom were locals. Six of the winners were family farmers, six were individual entrepreneurs and four were primary producers. Moreover, seven winners were young farmers and five were new entrants.271 The Claimants supply no evidence that the winners of the Tenders were politically favored individuals affiliated with the Fidesz party or otherwise related to the government.
334.
Similarly unsupported is the Claimants' contention that Hungary abolished the maximum landholding limitation applicable to family members in order to benefit families with connections to politicians. According to the Respondent, this abolishment contributed to the government's aim of keeping local farmers, who often belong to the same family, from migrating to the cities and abandoning the agricultural sector.272
335.
The Claimants' allegations of discrimination should also be dismissed, so pleads Hungary. None of their brandish allegations of xenophobic motives relate to the 2011 Amendment. As for the Claimants' assertion that the 2011 Amendment "only applied in the context of tenders for leases of State-owned, and not privately owned, land",273 the Respondent points out that there are objective differences between State-owned land and leases for privately-owned land, which cannot therefore be compared. In particular, leases of State-owned land can be attributed only by means of a public tender and benefit from significantly lower rental fees.274
336.
Finally, Hungary challenges the Claimants' allegation that Inícia's eviction did not follow due process. At the time of the eviction, the Claimants no longer had possessory title to the land. Thus, the NLA acting in its capacity of a landlord secured the eviction after giving multiple notices to Inícia to vacate the Land. As Professor Menyhárd explains, the orders that the Claimants had obtained from local authorities did not create a legal title to possession.275 In any event, even assuming that the eviction of Inícia had breached these orders, that would at most constitute a violation of a temporary procedural right – not a taking of the leasehold right. In addition, the intervention of the private security guards did not occur until after the Pest District Court had rejected Inícia's claims to the pre-lease rights in their entirety in October 2014.276 The claim of a breach of due process is therefore without merit.
337.
For these reasons, the Respondent requests the Tribunal to declare that the 2011 Amendment was a valid exercise of police powers and therefore did not constitute a compensable expropriation.

C. ANALYSIS

338.
The Claimants allege an expropriation of their leasehold rights. According to them, these rights include the following four categories: (i) the contractual pre-lease right under the Lease, (ii) the renewed lease agreement created by Inícia's exercise of the contractual pre-lease right through its letter of 29 April 2014,277 (iii) the right to damages arising out of the NLA's manipulation of the Tenders, and (iv) the statutory pre-lease right, the exercise of which was prevented by the 2011 Amendment.
339.
In its analysis of liability, the Tribunal will first review Hungary's measures in terms of expropriation of the statutory pre-lease right (1). Given the conclusion which it will reach, in respect of such right, it will dispense with the analysis of the alleged expropriation of the remaining categories of the purported leasehold rights. Thereafter, the Tribunal will assess whether the 2011 Amendment constituted a non-compensable exercise of Hungary's police powers (2). Finally, it will turn to the lawfulness of the expropriation under Article 6 of the BIT (3).

(1) Did the 2011 Amendment expropriate the statutory pre-lease right?

340.
It is common ground between the Parties that the 2011 Amendment prohibited the exercise of statutory pre-lease rights in relation to the NLA tenders. The Parties also agree that, at the time when the statute was passed, Inícia had a valid statutory pre-lease right under Hungarian law. The Respondent argues, however, that such statutory pre-lease right is not capable of being expropriated.
341.
The Parties made it clear in their answers to the Tribunal's questions that international law governs the question whether a particular right can be expropriated.278 By contrast, the existence and content of the right is subject to national law. Thus, while the expert evidence provided by the Parties in respect of rights capable of being expropriated within the meaning of Hungarian constitutional law may be helpful by analogy, it is not dispositive. The Tribunal must conduct an analysis under the BIT and international law in order to determine what types of rights or interests are protected under Article 6 of the BIT.
342.
Article 6 of the BIT prohibits the expropriation of "the investments of investors", except for a public purpose, with due process, in a non-discriminatory manner and against compensation. Article 1 of the BIT in turn defines the term "investment" as "every kind of asset connected with economic activities which has been acquired since 31 December 1972".279 In this context, the Respondent argues that "a right that is not vested or acquired as a matter of International Law is not susceptible of expropriation."280 Be this as it may, at the time of the 2011 Amendment, the Claimants did hold a vested right in the form of the statutory pre-lease right, as will be further addressed below.
343.

The doctrine of acquired or vested rights is well recognized in international and municipal laws. In the words of the Aramco tribunal:

The principle of respect of acquired rights is one of the fundamental principles both of Public International Law and of the municipal law of most civilized States.281

344.
The term expropriation used in Article 6 of the BIT should be interpreted in light of this doctrine as mandated by Article 31(3)(c) of the VCLT. The doctrine suggests that, while the State may change general statutes based on its policy decisions, where the statute provided for a possibility of acquiring rights with economic value and a private party availed itself of this possibility, subsequent regulatory changes must respect that vested right.282 As an example, a State can well change the rules applicable to pension entitlements. However, if an individual has acquired a right to pension entitlements under the existing statute, e.g. because he or she has reached the relevant retirement age, the detrimental legislative change must comply with this vested right.
345.

EnCana v. Ecuador, to which both Parties referred in the closing submissions, is helpful in this respect. There, the tribunal recognized that, although a State is free to change its laws, it may be held liable for expropriation if it retrospectively invalidates vested rights:

In the Tribunal's opinion, a law which cancels a liability the State already has to an investor [...] is capable of amounting to expropriation. The right under the law of the host State to refunds of VAT in respect of the past acquisition of goods and services is a material benefit, and it does not matter whether refunds take the form of tax credits or rights to actual payment of the amount due. There is an important distinction here between a law which changes the incidence of taxation in respect of future transactions and one which seeks to do so retrospectively. If the State wishes to provide by law that in respect of future transactions there is liability to VAT and no right to a refund, then prima facie at least that falls within the scope of its normal prerogative to determine and vary the incidence of a tax. But once a right to a refund has accrued in respect of past transactions (so that all that remains is the question of accounting for receipts and payments) the corresponding right to be paid is capable of falling within the broad scope of "amounts yielded by an investment", and it does not matter that the right arises under the public law of the State concerned.283

346.
The EnCana tribunal made a crucial distinction between rights (to VAT refunds) that had accrued and rights that had not yet accrued at the time when Ecuador passed the 2004 Act that suppressed these rights. According to the tribunal, "it is for Ecuador to determine for the future the regime of its tax law". However, the "position is different with respect to the period before 2004,"284 as the rights that accrued prior to the legislative change attracted protection from uncompensated taking.
347.
Throughout its written and oral submissions, Hungary heavily relied on the fact that the statutory pre-lease right was a right provided by general legislation, which the State could modify for policy reasons. The State's power to change its laws based on its policy determinations is unquestioned. This power must, however, be exercised in compliance with the international obligations of the State, including those in the field of the protection of investments. International law, and in particular the non-expropriation standard contained in Article 6 of the BIT, provides a certain degree of protection for vested rights. If a general statute gives private parties a possibility to acquire rights of economic value, changes to that legislation should not affect rights that had already been acquired under the statute. In this sense, the doctrine of vested rights is closely intertwined with the principles of non-retroactivity and legal certainty.
348.
This said, a distinction must be drawn between a statute conferring mere privileges or powers on private parties and the latter's subsequent exercise of these powers by acquiring what can be regarded as a vested right, i.e. an entitlement that is correlated with duties of a specific counterpart.
349.
The 1994 Arable Land Act provided the right (better termed a power) for any eligible person to enter into a lease agreement and thereby acquire a statutory pre-lease right. This power is not itself a vested right or an asset, and therefore the State could in principle change it without compensation.285 In turn, once a private party availed itself of this power and entered into a lease agreement, that party will hold a vested right.
350.
Thus, while the Respondent was at liberty to change its laws and remove or otherwise alter the provision allowing to enter into a lease agreement and acquire a statutory pre-lease right, the private parties who had previously availed themselves of this possibility by entering into specific lease agreements had vested rights that ought to have been respected.
351.
It is undisputed that the 2011 Amendment contained no transitory arrangements, nor did it exempt pre-lease rights of incumbent lessees.
352.
The question that remains is whether the statutory pre-lease right was among the vested rights that a lessee acquired by entering into a lease agreement. In the affirmative, the 2011 Amendment would be deemed expropriatory, because it prevented the Claimants from exercising their statutory pre-lease right and failed to exempt vested pre-lease rights under incumbent leases.
353.
The Claimants' legal expert Professor Halmai opined that the statutory pre-lease right was a vested right as of the conclusion of the relevant lease agreement.286 He explained his opinion in reference to the legislative intent behind the statutory pre-lease right, which was to induce long-term investment in the agricultural sector and, for that purpose, to enhance legal security for the lessees. As for the Respondent's legal expert Professor Menyhárd, he called the pre-lease right a vested right in his expert report.287 However, at the Hearing, he preferred not to elaborate, given his expertise in private law.288
354.
Professor Halmai's opinion is substantiated by the dissenting opinion of a judge of the Constitutional Court, who reasoned that, by passing the 2011 Amendment, "the legislator deprived the above lessees [i.e. the lessees that had lease agreements at the time of the entry into force of the 2011 Amendment] of a right with a property value that they acquired already at the time of the execution of the lease contracts".289 Notably, the majority of the court did not address whether the 2011 Amendment could amount to an expropriation of vested rights in violation of the right to property, since this question as such was not before the court.
355.
The opinion of Professor Halmai appears convincing. If one bears in mind that enterprises and foreign nationals are barred from owning agricultural land in Hungary, land lease agreements largely fulfil the same functions as property rights. As the Claimants explain, investments in the agricultural sector take time. In order to encourage long-term investments, the 1994 Arable Land Act provided for a pre-lease right, but this right could only induce long-term investments if the lessees could rely on it when entering into lease agreements.
356.
It is certainly true that the exercise of the pre-lease right is subject to conditions. However, as Professor Halmai rightly notes, the conditional nature of a right does not negate its existence or its nature as a vested right. For instance, as the Respondent observed, when making a long-term investment in reliance on the lease and the pre-lease right, the lessee should consider the possibility that, upon the expiry of the lease, the owner may decide to use the land, in which case the pre-lease right could not be exercised. While this is true, Mr. Hunter correctly remarked that the risk that the State would decide to become a farmer instead of leasing its land was negligible.290 And indeed, it is not the materialization of this risk that made the exercise of the pre-lease right impossible for Inícia. It was the legislative act that proscribed the exercise of pre-lease rights, without providing exceptions for lessees that had already acquired the pre-lease right under the incumbent lease agreements.
357.

The Respondent further points to the pre-lease clause in the 2006 Lease Amendment, according to which a pre-lease right "may be exercised in accordance with the applicable laws effective at all times".291 This language subjects the exercise of the contractual pre-lease right to the applicable law. It has no bearing, however, on the statutory pre-lease right, the exercise of which is restricted by the 2011 Amendment in the following terms:

In case of leasehold of rural land or farm, a pre-lease right arising from legal regulations may not be exercised.292

358.
The nature and scope of the statutory pre-lease right must be assessed by reference to the relevant statute, i.e. the 1994 Arable Land Act. Pursuant to Section 21 of that Act, a lessee of a usufructuary lease was entitled to a pre-lease right.293 As described above, given the purpose and context of this statutory provision, the entitlement to and the reliance on the pre-lease right arose upon the conclusion of a usufructuary lease agreement. Thus, Inícia's entitlement to the statutory pre-lease right existed by virtue of Section 21 of the 1994 Arable Land Act and of the Lease. The contractual pre-lease clause does not alter the nature and scope of the statutory pre-lease right. Indeed, even if the 2006 Lease Amendment contained no pre-lease provision at all, Inícia would still benefit from the statutory pre-lease right under Section 21 of the 1994 Arable Land Act because it had entered into a usufructuary lease agreement.
359.
The Parties have also debated whether the pre-lease right is a right in rem or not. That debate seems largely inapposite for the purposes of this analysis. As the Parties' legal experts confirmed, the scope of the rights protected from expropriation is not congruent with the closed list of in rem rights in civil law.294 While the dichotomy between in rem and in personam rights has its place in determining the rights and obligations of private parties vis-à-vis one another, the prohibition of uncompensated expropriation is a rule restricting the State authority towards private parties. Because of the different legal functions involved, the civil law dichotomy should not be mechanically transposed into public law. Indeed, it would be excessively formalistic and not consonant with economic reality, if the BIT protected a usufruct-holder from an uncompensated taking, while at the same time withholding that protection from a lessee with a pre-lease right for the sole fact that such right is not in rem.
360.
It does not appear disputed that the function of the statutory pre-lease right was to guarantee stability and legal certainty for lessees of agricultural land, and thus induce long-term investments. In a situation where corporations and foreign nationals were barred from owning agricultural land, the pre-lease right brought stability of the lease that was viewed as a functional alternative to ownership. For these reasons, the Tribunal shares Professor Halmai's opinion that, due to the pre-lease right, the lease fulfilled the same function as ownership in terms of the investor's expectations of legal certainty and stability. As a result, the pre-lease right must be deemed to benefit from the protection against uncompensated State interference. In other words, a deprivation of already vested pre-lease rights should have been accompanied by compensation even if the State acted with a legitimate public purpose, evenhandedly and with procedural propriety.
361.
Finally, the Parties have discussed whether the statutory pre-lease right has a financial value.295 It seems evident that a right, albeit a conditional one, to extend a lease agreement has a financial value as the right-holder is in an economically more advantageous position than a lessee without a similar right. The financial value of a pre-lease right can also be seen from the market practice, whereby incumbent lessees sometimes appoint third persons to exercise the pre-lease right in their stead in exchange for consideration.296 The fact that the value of the pre-lease right may be difficult to quantify does not mean that the right lacks value. The Respondent's own valuation expert sought to convince the Tribunal that the value of the pre-lease right could be established independently by using freehold ownership as a proxy.297
362.
For these reasons, while Hungary was at liberty to remove or otherwise alter the statutory pre-lease provision contained in the 1994 Arable Land Act in a prospective manner, such a change should not have applied retrospectively to already vested rights. Or else, the State should have provided compensation. Specifically with respect to the Claimants' investment, the 2011 Amendment resulted in the expropriation of the statutory pre-lease right that Inícia had acquired pursuant to the 1994 Arable Land Act by entering into the Lease.
363.
Having reached this conclusion, the Tribunal dispenses with analyzing whether the Respondent also expropriated Inícia's contractual pre-lease right, or whether such right was extinguished as a result of the 2006 Lease Agreement. Subject to the police powers defense addressed in the next section, the finding that Hungary expropriated Inícia's statutory pre-lease right suffices to hold Hungary liable for the harm caused to the Claimants as a result of the loss of the Lease. Had the 2011 Amendment carved out the pre-lease rights of incumbent lessees, Inícia would in all likelihood have exercised that right and kept its Lease. Therefore, a finding that the contractual pre-lease right was also expropriated would have no impact on the assessment of damages. Nor would the claims concerning the alleged manipulation of tender results have an independent impact on the quantification of the loss. Therefore, for reasons of judicial economy and procedural efficiency, the Tribunal will dispense with addressing these additional issues.

(2) Was the 2011 Amendment a non-compensable regulatory measure?

364.
Investment treaty jurisprudence recognizes that, in certain circumstances, a bona fide exercise of the State's right to regulate is exempt from the duty to provide compensation.298 That being said, creating an unqualified exception from the duty of compensation for all regulatory measures would hardly be compatible with the language of non-expropriation provisions of investment treaties, such as Article 6 of the BIT, which require compensation for direct and indirect expropriation even if the measures at issue are for a public purpose, non-discriminatory and compatible with due process of law. As the tribunal in Pope & Talbot v. Canada warned, such blanket exception "would create a gaping loophole in international protections against expropriation."299
365.
There is no comprehensive test that may be used to distinguish regulatory expropriation, for which compensation is required, from an exercise of police or regulatory powers, which does not give rise to a duty of compensation. In the words of Saluka v. Czech Republic, "international law has yet to identify in a comprehensive and definitive fashion precisely what regulations are considered 'permissible' and 'commonly accepted' as falling within the police or regulatory power of States and, thus, non-compensable."300
366.

This being so, a review of investment awards shows that measures annulling rights of the investor – as in the present case – can be exempt from the otherwise applicable duty of compensation only in a narrow set of circumstances. These circumstances can be categorized in two broad groups:

• First, the exemption from compensation may apply to generally accepted measures of police powers that aim at enforcing existing regulations against the investor's own wrongdoings, such as criminal, tax and administrative sanctions, or revocation of licenses and concessions.301 It is evident that the 2011 Amendment does not pertain to this group.

• The second group consists of regulatory measures aimed at abating threats that the investor's activities may pose to public health, environment or public order.302 This line of case law relates to measures such as the prohibition of harmful substances, tobacco plain packaging, or the imposition of emergency measures in times of political or economic crises. The 2011 Amendment does not fall in this group either.

367.
It rather emerges from the record that the 2011 Amendment was inspired by Hungary's decision to change its agricultural land holding policy. While Hungary was fully entitled to change its policies, in doing so it was required to respect vested rights. In other words, it is not immediately apparent why this policy change - which purportedly benefited Hungarian society as a whole - should have been carried out at the expense of the Claimants' vested rights. Unlike in the above two groups of situations, there is no rationale that would justify exempting Hungary from its duty to pay compensation under Article 6 of the BIT.

(3) Was the expropriation lawful?

368.
It is undisputed that Hungary has not compensated the Claimants for the expropriation of their statutory pre-lease right. Thus, the expropriation is unlawful for lack of compensation. Whether an expropriatory measure is unlawful for additional reasons may have an impact on the calculation of damages in certain instances.
369.
Most importantly, a finding that expropriation is unlawful for reasons other than the lack of compensation may entitle a claimant investor to request compensation for the value of the expropriated asset on an ex post basis, i.e. on the date of the award.303 Yet, in the present case, the Claimants seek the value of their leasehold rights ex ante, i.e. as of July 2015, which is the date of their eviction from the Land.
370.
They do so by subtracting the value of the Farm without the Lease from the value of the Farm with the Lease. This approach seems to yield the value of the expropriated pre-lease rights. Indeed, without expropriation of their pre-lease right, the Claimants would in all likelihood have renewed the lease by matching the offers made by the winners of the Tenders. The Respondent's valuation expert concedes that "the lost value of the leasehold rights could be quantified by comparing the value of the Farm with and without those rights. In other words, the difference in the value of the Farm with and without the leasehold rights is equal to the lost value of those rights."304 Therefore, the Claimants do not appear to be claiming more than "the fair market value of the investment expropriated immediately before the expropriation", which is the compensation standard for lawful expropriations under Article 6 of the BIT. Thus, in this respect, it makes no practical difference whether the expropriation is unlawful for reasons other than lack of compensation.
371.
Another aspect of the valuation for which a finding of lawfulness may theoretically make a difference is pre- and post-award interest. However, Article 6 of the BIT requires an award of interest "at a normal commercial rate". As explained in the relevant section below, even if the principle of full reparation is applied, the Claimants would not be entitled to more than a normal commercial rate of interest in the circumstances of the present case.
372.
Therefore, the Tribunal comes to a conclusion that it may dispense with determining whether the expropriation was unlawful for reasons other than lack of compensation.

VI. QUANTUM

373.
The Parties are in dispute about the calculation of the damages allegedly suffered by the Claimants as a result of the Respondent's conduct. Each of them relied on a valuation expert to support its position.

A. THE CLAIMANTS' POSITION

374.
The Claimants seek compensation for the expropriation of the pre-lease right. They rely on a valuation expert report by Mr. James Gilbey of Mazars LLP, who primarily valued the expropriated leasehold by comparing the actual value of the Farm (without the leasehold rights) with the but-for value of the Farm (with the leasehold rights).305 More precisely, Mr. Gilbey valued the leasehold rights by reference to the stream of profits that those rights could have been expected to produce for the Claimants' farming business if they had not been expropriated.306 The but-for scenario thus assumes that the Lease would be renewed for 20 years starting from 2014.307
375.
As for the valuation date, Mr. Gilbey considered that the expropriation crystalized in July 2015, which is the time of the physical eviction of the Claimants. He thus took July 2015 as the valuation date.
376.
Further, the Claimants seek to rebut the Respondent's criticism that Mr. Gilbey calculated the but-for value of the Farm on an ex ante basis, i.e. in July 2015, while he assessed the actual value ex post. According to the Claimants, for the actual value, Mr. Gilbey used July 2015 as a valuation date, but he used "actual cash-flows for the years up to and including 2017", instead of projecting hypothetical cash flows from 2015 on.308 For the event that the Tribunal accepts the Respondent's criticism, Mr. Gilbey prepared a "secondary" valuation, which only takes into account ex ante data for both the but-for and the actual values of the farm.
377.

The Claimants also reject the Respondent's allegation that they have failed to mitigate the loss. They point out that the burden of proof is on the Respondent to demonstrate that there were reasonable and economically feasible alternative actions available to them.309 For them, the Respondent failed to discharge this burden, due to the fact that they have in reality engaged in multiple efforts to continue their farming business in Hungary. Yet, despite these efforts, their Farm lost significant value. Specifically, the Claimants stress the following mitigating actions:

• Mr. Hunter described how the Claimants sought to lease replacement land from private individuals by publishing an advertisement and an article in a local newspaper.310 They only received an offer for 15 hectares of land 50 km away. In any event, the privately-owned land is encumbered by statutory pre-lease rights, meaning that the Claimants would be pre-empted by the incumbent lessees.

• Inícia's employees travelled sometimes hundreds of kilometers to purchase feed for and dispose of digestate from the cows.311

• Mr. Hunter personally made efforts in (i) qualifying as a 'local farmer' in 2015 in order to bid at auctions to buy agricultural land for the farm; and (ii) sitting for the examination to become a Hungarian citizen in order to persuade the Respondent to sign the contract with him for the 86-hectare parcel of land that he subsequently won at auction. Despite these efforts, Mr. Hunter was ultimately deprived of this opportunity to mitigate Claimants' losses by Mr. Rácz, the son of a local Fidesz mayor, who exercised his statutory pre-emption right to take over the ownership of this parcel of land in place of Mr. Hunter.312

• The Claimants obtained temporary and unnotified sublets to the portions of the Land from the winners of the Tenders. In particular, they sub-leased (i) 86 hectares won by Robert Rácz (Tender No. 10213); (ii) 13 hectares from the plot won by Viktor Huszar (Tender No. 10211); and (iii) 8 hectares from the plot won by Zoltan Kovács (Tender No. 10212).313

378.
Furthermore, the Claimants argue that the criticism raised by the Respondent's expert at the milk prices, applied in Mr. Gilbey's valuation as equal to EU prices, is also unmeritorious. It fails to consider that Inícia actually achieved to sell milk at EU prices in 2018 and that many of its contracts are pegged to German milk prices, which are even higher than the EU average price.314
379.
For the Claimants, the Respondent's criticism of Mr. Gilbey's calculation of the price of calves and in-calf heifers is equally unfounded. While the Respondent is right that the Claimants have historically sold culled cows at a 70% discount, they have never sold cows producing milk or in-calf heifers. Therefore, Mr. Gilbey's assumption that those could be sold at a market value is reasonable.
380.
The Claimants also refute the comments by Respondent's expert Mr. Sequeira according to which Mr. Gilbey assumed that certain costs would remain fixed despite his projection of a significant increase in the size of the herd and the production of milk. As Mr. Hunter explains, "[t]he costs of running the facilities (which can cater for up to 2500 animals) are fixed."315
381.
In connection with interest rates, Mr. Gilbey has applied 7.87% by reference to the rate of return on capital that the shareholders of Magyar had realized historically and thus could reasonably have expected to enjoy in the future, but for the expropriation. Contrary to the Respondent's criticism, the "normal commercial rate" of interest envisaged in the BIT's expropriation provision is not applicable here, since this is an unlawful expropriation. Similarly, the Respondent's expert wrongly suggests that Mr. Gilbey's proposal to compound interest semi-annually is incompatible with his choice of the annual rate of return as the interest rate. As Mr. Gilbey explains, when computing the compound interest he did not simply divide 7.87% in two, which would have given 3.94%, but instead reduced the semi-annual rate to 3.86% to take into account that the interest is compounded semi-annually.316
382.
Finally, the Claimants also request compensation for the costs of the Hungarian court proceedings. They point to the jurisprudence of investment tribunals, which confirms that such costs are recoverable under the principle of full compensation.317 Following the Respondent's comment that the supporting invoices included unrelated transactions, the Claimants subtracted three out of five invoices from the claimed amount calculations, as these dealt with costs related to the Claimants' Serbian farm.
383.
With respect to the Respondent's criticism that Mr. Gilbey double-counted the litigation costs, since these costs were already accounted for in the but-for value of the Farm, the Claimants point to the passage of Mr. Gilbey's report, where he explains that, since legal and professional costs were unusually high in the year 2014, he took the average of the prior two years (2012 and 2013) to reflect these costs more accurately.318 Therefore, the litigation costs are not included in the but-for value of the farm.
384.
For these reasons, the Claimants request the Tribunal to award full compensation for damages resulting from the Respondent's unlawful expropriation of their leasehold rights in the amount of EUR 17,900,000, plus costs and expenses of these proceedings, as well as costs and expenses and of the litigation in Hungary in an amount of HUF 57,222,236, together with interest at 7.87% compounded semi-annually until the payment is made in full.

B. THE RESPONDENT'S POSITION

385.
The Respondent relies on a valuation report prepared by Mr. Kiran Sequeira of Versant Partners LLC. Mr. Sequeira has estimated the range of the Claimants' loss between EUR 3,400,000 and EUR 5,600,000.
386.
The Respondent first contends that the standard of compensation should be the "fair market value of the investment expropriated", as envisaged by Article 6(1) of the BIT, and not that of consequential loss, as suggested by the Claimants. The BIT standard of compensation for expropriation is entirely in line with the principle of full reparation, since in modern economics the value of an asset captures the expected profits that the asset can generate.319 Since the value of the expropriated asset already includes all possible future profits, adding further elements to the valuation, as the Claimants and their expert do, results in double-counting and overcompensation.
387.
According to Hungary, Mr. Gilbey did not seek to determine the market value of the expropriated leasehold rights but chose, instead, to value the entire farming business by comparing the actual with the but-for value of the Farm. While Mr. Gilbey suggests that by this method he valued the Claimants' leasehold rights, he does not explain why the result is much higher than the value of the land owned by Inícia. Indeed, on one hand, Mr. Gilbey's documents show that the 105 hectares of land owned by Inícia was worth EUR 6,900 per hectare. On the other hand, Mr. Gilbey values the leasehold rights to the Land at EUR 15,650 to EUR 18,867 per hectare.320 This is a clear overstatement.
388.
Furthermore, Mr. Gilbey determined the but-for value of the Farm as of July 2015 (ex ante basis), while he assessed the actual value of the Farm as at December 2017 (ex post basis). Mr. Sequeira explains that this approach is defective as it results in compensating the Claimants by an additional EUR 4,100,000 for market factors that impacted the value after the alleged breaches and are wholly unrelated to them.321
389.

The Respondent further submits that the Claimants have failed to mitigate the loss by not obtaining a substitute lease for privately owned land. It in particular points to the following contentious facts and evidence:

• Data obtained from the Hungarian Land Use Registry shows that each year between 2011 and 2015, a substantial amount of agricultural leases had been registered in the area surrounding the farm, meaning that agricultural land often changed lessees. In 2015 alone, new leases were registered for a total of more than 166,000 hectares in the area, for a total of 5,923 registration applications.322

• The Claimants do not provide evidence that they ever offered a price above market price to secure alternative land. As Mr. Sequeira calculates, even assuming that the Claimants had to pay a 50% premium over their existing rates to secure a substitute rent, the present value of this over-payment for the entire 20-year period of the lease would be EUR 930,000. This is the maximum loss amount that the Claimants may recover.

• While the Claimants assert that they have partly mitigated the loss by subleasing the State-owned land from the winners of the Tenders, their expert Mr. Gilbey confirms that he did not include this mitigation in his calculation on the purported basis that these quasi sub-lease arrangements "do not offer security of tenure to Claimants".323 As Mr. Sequeira notes, this analysis is simply incorrect from an economic perspective and results in overcompensation.324

390.
In addition, Mr. Gilbey concludes that the but-for value of the Farm as of July 2015 was EUR 17,600,000 (a reduction of EUR 1,300,000 compared to his first report, as he took several criticisms of Mr. Sequeira into account). Yet, Mr. Sequeira shows that Mr. Gilbey's updated calculation of the but-for value of the Farm remains overstated because it fails to rely on available, appropriate and reliable data regarding milk prices, quantity of privately leased land, livestock prices, overhead costs, fixed and variable costs, and discount rate.325
391.

As for Mr. Gilbey's calculation of the actual value of the Farm, his estimate is between EUR 5,600,000 and EUR 7,700,000 million depending on which of his three alternative approaches of the actual value of the farm is adopted: (i) December 2017 going concern; (ii) July 2015 going concern and (iii) break up basis. Mr. Sequeira disagrees with each of these three alternative valuations for the following reasons:

• Mr. Gilbey's projection of the Farm's future potato production is understated and inconsistent with the Farm's actual performance.326

• Mr. Gilbey's assumptions of arable farming costs erroneously excludes the portion of State land that Claimants continue to use to grow crops on a "quasi-subletting" basis.327

• Mr. Gilbey does not adequately support his assumptions regarding which costs are fixed costs.328

• Mr. Gilbey erroneously applies an illiquidity discount to the actual value of the Farm.329